| Location: | Kentucky |
|---|---|
| Posted: | Aug 17, 2026 |
| Due: | Sep 16, 2026 |
| Agency: | State Government of Kentucky |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | RFB-785-2700000072-1 |
| Publication URL: | To access bid details, please log in. |
| General Information | |
| Document ID | RFB-785-2700000072-1 |
| Status | Open |
| Description | RFB-63-27 DOC KSP HVAC System 4 Cell House |
| Department | Facilities & Support Services |
| Type | Request for Bids (RFB) |
| Issue Date | 08/17/2026 12:00 AM EDT |
| Closing Date | 09/16/2026 01:30 PM EDT |
| Bid Opening Date | 09/16/2026 03:00 PM EDT |
| Buyer Name | Susan Ward |
| Buyer Email | Susan.Ward@ky.gov |
| Buyer Phone | 502-226-0335 |
| Location | Bid Receiving, See Terms & Conditions for Bid Submission Instructions, Other, KY |
| Commodity Codes | ||
| Code | Description | Extended Description |
| 912 | CONSTRUCTION SERVICES, GENERAL (INCL. MAINTENANCE AND REPAIR |
***ONLY ONLINE BIDS WILL BE ACCEPTED FOR THIS RFB.***
Emailed and hard copies delivered by any method WILL NOT BE ACCEPTED. On this line, Bidders must enter $0.00 for Contract Amount in the e-procurement system. Actual Contract Amount must be entered on "Official Bid Document" and submitted as an attachment in the e-procurement system. Vendors should review and update, if necessary, all addresses and contact persons for their account prior to bid submission. This information will carry forward to a contract if awarded, therefore please ensure all information is correct. ** Entire Official Bid Document and Bid Bond (if required) should be combined as one PDF and uploaded** The Project involves the replacement of the HVAC systems that serve the KSP 4 Cell House. A phased work approach is specified that includes the initial installation of an RTU at grade and an ERV unit in the Attic, removal of the AHU from the Basement, selected removal/ modification of ductwork throughout the building, installation of ductwork in the Basement and Attic, and replacement of supply air ductwork to each Cell. Structural work includes Attic slab framing, supports, and slab penetration reinforcement. Architectural work includes repair and modification of selected windows, revisions to windows for mounting of exhaust fans. Installation of a natural gas line to the RTU and electrical services to HVAC equipment. A new smoke evacuation system will be provided. The work of the Project is considered within the KSP security boundary. All work must be performed in a sequenced effort coordinated with the KSP. |

With GovernmentContracts, you can:
...Project: Muddy Fork Pump Station Generator Replacement Ref. #: 17387 Type: ITB Status: ...
Louisville & Jefferson County Metropolitan Sewer District
Bid Due: 10/06/2026
...be combined as one PDF and uploaded** Interior renovation and replacement of all ...
State Government of Kentucky
Bid Due: 9/21/2026
...be combined as one PDF and uploaded** Interior renovation and replacement of all ...
State Government of Kentucky
Bid Due: 9/21/2026
...Follow Rough River LakeAxtel Wastewater Treatment Plant Replacement Active Contract Opportunity... Plant Replacement. ...
DEPT OF DEFENSE
Bid Due: 9/25/2026