San Dieguito Union High School District
Maribel Suarez, Director of Purchasing
Purchasing Department
BID NO. B2026-09
Canyon Crest Academy Learning Commons Flooring
ADDENDUM No. 1
I. REQUEST FOR INFORMATION:
1. Question: Please confirm that the drawing entitled Option 1 is the color layout for Area
B for the Base bid.
Answer: Yes it is
2. Please confirm that the Allowance Value of $15,000.00 and the Contingency of up to
5% are not to be included within the Base Bid.
Answer: No it is not included in the Base Bid.
4. Who will be responsible for the removing and replacing of any furniture and
electronics?
Answer: The district will be responsible for removing the furniture and electronics.
5. What is the existing flooring in Areas A through K?
Answer: Existing flooring in all areas except for “C”.
Area “C” is carpet half carpet & Vinyl
I. REVISIONS:
1. Bid document Quick Reference page & Special Conditions Section A completion date
revision. See attached documents.
2. Drawings Attached
END OF ADDENDUM 1
ADDENDUM No. 1
Legend
New Nora flooring As per attached layout
Noraplan Unita 7105 Push N Pull Field Color
Noraplan Unita 7116 Fire N Ice Accent color
Noraplan Unita 7120 Night N Day Accent Color
Area: B,
Stairs, Area: C
Upper Landing Noraplan Unita (see area B)
Nora Argo on Middle Landing
Nora Arago 1 Piece Tread & Raisers Color Tranquil & Unity (alternating)
New Nora flooring, Noraplan Unita 7105 Push N Pull Field Color
add alternate, Area: D, K
New Carpet Flooring Tarkett Aftermath III SD Red Ringer 24"x 24"
Area: A
New Carpet Flooring same as Area A
add alternate, Area: E, F, G, H
K
454.79 sf
H
94.53 sf
A
5,500.63 sf
B
939.5 sf
G
217.23 sf
F
170.05 sf
E
176.32 sf
C
142.56 sf
D
1,441.98 sf
Canyon Crest Academy - Learning Center - San Diego, CA
Second Floor - Option 1
5/4/2026
noraplan unita
7105
122 x 1500 cm | 3151.67 ft² | 16 tiles
7116
122 x 1500 cm | 196.98 ft² | 1 tiles
7120
122 x 1500 cm | 393.96 ft² | 2 tiles
PROJECTED GROSS EMBODIED CARBON (cradle-to-gate):
Interface
2041 kg. CO₂e
Industry Average
5459 kg. CO₂e
Learn more about these values at www.interface.com/carbonmetrics
Case Number: 02229910
Estimate Floorplan Scale: 1/8" = 1"0" at ARCH C
© 2024 Interface, Inc and nora systems GmbH. For reference only. Measurements are not guaranteed to meet specific project specifications.
Not to be used for ordering materials or products. See interface.com/IDSdisclaimer for full disclaimer limitations.
For the best results please view this PDF on screen only, as printing may compromise the colour and clarity of the images.
BID PACKAGE
Canyon Crest Academy Learning Commons Flooring
Bid No. B2026-09
Maribel Suarez, Director
PURCHASING DEPARTMENT
San Dieguito Union High School District
710 Encinitas Blvd
Encinitas, CA 92024
Superintendent
Dr. Anne Staffieri, Ed. D.
Board of Trustees
Jane Lea Smith
Rimga Viskanta
Jodie Williams
Michael Allman
Phan Anderson
BID DOCUMENTS
Canyon Crest Academy Learning Commons Flooring
Bid No. B2026-09
TABLE OF CONTENTS
Quick Reference Page…………………………………………………………………….........3
BID DOCUMENTATION
Notice Inviting Informal Bids…………………………………………………………………….5
Instruction to Bidders………………………………………………………………………........7
Scope of Work……………………………………………………………………………….....16
Plans & Drawings……………………………………………………………………….Exhibit A
General Conditions……………………………………………………………......Attachment 1
Special Conditions………………………………………………………………………..........17
Fingerprinting and Criminal Background Check Certification...........………………..........20
Agreement…………………………………………………………………………………........22
Performance Bond………………………………………………………………………..........24
Payment Bond…………………………………………………………………………….........28
BID SUBMITTAL PACKET
Bid Form…………………………………………………………………………………….........3
Non-Collusion Declaration………………..……………………………………………............6
Bid Bond…………………………………………………………………………………….........7
Certification of Contractor & Subcontractor DIR Registration……………….……..............9
Designation of Subcontractors………………………………………………………….........10
Information Required of Bidders………………………………………………………..........11
Contractor’s Certificate Regarding Workers’ Compensation………………...…...............18
Asbestos-Free Materials Certification………………………………………………….........19
Drug-Free Workplace Certification……………………………………………………..........20
Iran Contracting Act Certification……………………….……………………………............22
Recycled Content Certification………………………………………………………….........23
California Air Resources Board (CARB) Certification………...........................................24
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.