FINAL OPINION OF PROBABLE COSTS
MANSFIELD BRINSAP BRIDGE REPAIR PROJECT
DATE: FEBRUARY 18, 2026
BRIDGE #1 - COUNTRY CLUB DRIVE @ HOGPEN BRANCH (6-10'x10' - 90 LF)
ITEM
NO. DESCRIPTION
101 MOBILIZATION, BONDS & INSURANCE (5%)
102 TRAFFIC CONTROL
103 INSTALL OM-3R OBJECT MARKERS
UNITS QUANTITY UNIT COST
LS
1
LS
1
EA
2
$140.00
$2,000.00
$400.00
AMOUNT
$140.00
$2,000.00
$800.00
BASE BID SUBTOTAL - BRIDGE #1
$2,940.00
BRIDGE #2 - DEBBIE LANE @ HOGPEN BRANCH (8-10'x10' - 125 LF)
ITEM
NO. DESCRIPTION
UNITS QUANTITY UNIT COST
201 MOBILIZATION, BONDS & INSURANCE (5%)
LS
1
202 TRAFFIC CONTROL
LS
1
203 REPAIR 2' x 2.5' x 3" DEEP SPALL AT WINGWALL JOINT SF
5
204 THIN-BONDED CONCRETE PAVEMENT REPAIR
CF
2
205 INSTALL OM-3R OBJECT MARKERS
EA
2
206 FILL
CY
1
207 SOLID SOD
SY
2
BASE BID SUBTOTAL - BRIDGE #2
$765.00
$8,000.00
$500.00
$2,000.00
$400.00
$50.00
$10.00
AMOUNT
$765.00
$8,000.00
$2,500.00
$4,000.00
$800.00
$50.00
$20.00
$16,135.00
BRIDGE #3 - ELM STREET @ WALNUT CREEK (3-10'x10' - 32 LF)
ITEM
NO. DESCRIPTION
301 MOBILIZATION, BONDS & INSURANCE (5%)
302 TRAFFIC CONTROL
303 EPOXY SEAL SIDEWALK & RIP-RAP JOINTS
304 HMAC REMOVAL & REPLACEMENT
305 INSTALL OM-3R OBJECT MARKERS
BASE BID SUBTOTAL - BRIDGE #3
UNITS QUANTITY UNIT COST
LS
1
$1,519.00
LS
1
$10,000.00
LF
50
$10.00
SY
212
$90.00
EA
2
$400.00
AMOUNT
$1,519.00
$10,000.00
$500.00
$19,080.00
$800.00
$31,899.00
BRIDGE #4 - HOLLAND ROAD @ LOWE BRANCH (6-10'x10' - 32 LF)
ITEM
NO. DESCRIPTION
401 MOBILIZATION, BONDS & INSURANCE (5%)
402 TRAFFIC CONTROL
403 REMOVE EX. METAL BEAM GUARD FENCE
404 REMOVE TERMINAL ANCHOR SECTION
405 INSTALL THRIE-BEAM TRANSITION
406 INSTALL METAL BEAM GUARD FENCE (TIM POST)
407 INSTALL SAFETY GUARDRAIL TERMINAL (SGT)
408 INSTALL DOWNSTREAM ANCHOR TERMINAL
409 REMOVE / REPLACE HMAC (8")
410 INSTALL OM-3R OBJECT MARKETS
411 CONSTRUCT 5" CONCRETE RIPRAP
412 FILL
BASE BID SUBTOTAL - BRIDGE #4
UNITS QUANTITY UNIT COST
LS
1
$2,347.75
LS
1
$10,000.00
LF
200
$5.00
EA
4
$300.00
EA
4
$2,500.00
LF
75
$35.00
EA
2
$5,000.00
EA
2
$1,750.00
SY
27
$90.00
EA
2
$400.00
CY
6
$900.00
CY
2
$50.00
AMOUNT
$2,347.75
$10,000.00
$1,000.00
$1,200.00
$10,000.00
$2,625.00
$10,000.00
$3,500.00
$2,430.00
$800.00
$5,400.00
$100.00
$49,402.75
BRIDGE #5 - S. MITCHELL ROAD @ LOWE BRANCH (3-10'x10' - 34 LF)
ITEM
NO. DESCRIPTION
501 MOBILIZATION, BONDS & INSURANCE (5%)
502 TRAFFIC CONTROL
503 INSTALL OM-3R OBJECT MARKETS
504 5" CONCRETE RIPRAP
505 REMOVE / REPLACE HMAC ROADWAY
506 FILL
BASE BID SUBTOTAL - BRIDGE #5
UNITS QUANTITY UNIT COST
LS
1
$3,555.00
LS
1
$10,000.00
EA
2
$400.00
CY
6
$900.00
SY
610
$90.00
CY
2
$50.00
AMOUNT
$3,555.00
$10,000.00
$800.00
$5,400.00
$54,900.00
$100.00
$74,755.00
BRIDGE #6 - NEWT PATTERSON ROAD @ WALNUT CREEK (4-6'x5' - 26 LF)
ITEM
NO. DESCRIPTION
601 MOBILIZATION, BONDS & INSURANCE (5%)
602 TRAFFIC CONTROL
603 REPAIR SPALLING IN WEST ABUTMENT WALL
604 INSTALL OM-3R OBJECT MARKETS
605 INSTALL METAL BEAM GUARD FENCE (TIM POST)
606 INSTALL SAFETY GUARDRAIL TERMINAL (SGT)
607 INSTALL DOWNSTREAM ANCHOR TERMINAL
608 RETROFIT MODIFIED TYPE T631LS TRAFFIC RAIL
BASE BID SUBTOTAL - BRIDGE #6
UNITS QUANTITY UNIT COST
LS
1
$3,257.78
LS
1
$10,000.00
SF
50
$300.00
EA
2
$400.00
LF
162.5
$35.00
EA
2
$5,000.00
EA
2
$1,750.00
LF
100.84
$200.00
AMOUNT
$3,257.78
$10,000.00
$15,000.00
$800.00
$5,687.50
$10,000.00
$3,500.00
$20,168.00
$68,413.28
BRIDGES #7 & #8 - MATLOCK ROAD @ WALNUT CREEK
ITEM
NO. DESCRIPTION
701 MOBILIZATION, BONDS & INSURANCE (5%)
702 TRAFFIC CONTROL
703 REMOVE / REPLACE MBGF (TIM POST)
704 REMOVE / RESET SGT
705 REMOVE SGT
706 INSTALL SGT
707 INSTALL OM-3R OBJECT MARKETS
708 EPOXY SEAL SIDEWALK / INLET JOINT
709 FLOWABLE FILL
710 INSTALL TYPE R STONE RIPRAP
BASE BID SUBTOTAL - BRIDGES #7 & #8
UNITS QUANTITY UNIT COST
LS
1
LS
1
LF
50
EA
2
EA
1
EA
1
EA
3
LF
15
CY
4
CY
17
$1,066.25
$5,000.00
$40.00
$2,500.00
$500.00
$3,500.00
$400.00
$10.00
$250.00
$175.00
AMOUNT
$1,066.25
$5,000.00
$2,000.00
$5,000.00
$500.00
$3,500.00
$1,200.00
$150.00
$1,000.00
$2,975.00
$22,391.25
BRIDGE #9 - RETTA-MANSFIELD ROAD @ WALNUT CREEK (2-7'x6' - 49 LF)
ITEM
NO. DESCRIPTION
901 MOBILIZATION, BONDS & INSURANCE (5%)
902 TRAFFIC CONTROL
903 TRIM VEGETATION FOR SIGN VISIBILITY
904 REPAIR 15" x 15" x 2" SPALL
905 INSTALL OBJECT MARKER TYPE 3
BASE BID SUBTOTAL - BRIDGE #9
UNITS QUANTITY UNIT COST
LS
1
$310.00
LS
1
$2,000.00
LS
1
$1,000.00
SF
2
$1,000.00
EA
4
$300.00
AMOUNT
$310.00
$2,000.00
$1,000.00
$2,000.00
$1,200.00
$6,510.00
BRIDGE #10 - WALNUT CREEK DRIVE @ HOGPEN BRANCH (4-10'x10' - 60 LF)
ITEM
NO. DESCRIPTION
1001 MOBILIZATION, BONDS & INSURANCE (5%)
1002 TRAFFIC CONTROL
1003 INSTALL FLOWABLE FILL
1004 FURNISH & INSTALL FILL FOR SOD AREAS
1005 REPAIR SPALLING AT RAILING
1006 SOLID SOD
BASE BID SUBTOTAL - BRIDGE #10
UNITS QUANTITY UNIT COST
LS
1
LS
1
CY
2
CY
40
LS
1
SY
45
$449.00
$5,000.00
$250.00
$20.00
$2,500.00
$4.00
AMOUNT
$449.00
$5,000.00
$500.00
$800.00
$2,500.00
$180.00
$9,429.00
BASE BID
CONTINGENCY (15%)
BASE BID TOTAL
$281,875.28
$42,281.29
$324,156.57