| Location: | Utah |
|---|---|
| Posted: | Jun 29, 2026 |
| Due: | Jul 23, 2026 |
| Agency: | AGRICULTURE, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 1240LT26Q0001 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
The Bear River Administrative Site is located on the Evanston – Mountain View Ranger District of the Uinta – Wasatch – Cache National Forest, in Summit County, Utah, approximately 31 miles south of Evanston, WY. The Bear River Administrative Site is located on the East side of UT HWY 150 at approximately MM 46.4. The well, the new utility building and much of the distribution system are located in the NE quarter of Section 29, Township 2N, Range 10E, SL B&M. The well is located at (Latitude 40.88265N, Longitude -110.83050W) at an elevation of approximately 8,460 feet.

With GovernmentContracts, you can:
...Construction Place of Performance: Beaver , UT 84713 USA Description View Changes On ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 9/23/2026
...within a portion of the City's 1200 W sewer trunk line located along ...
State Government of Utah
Bid Due: 9/30/2026
...: 237990 - Other Heavy and Civil Engineering Construction Place of Performance: Beaver ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 9/23/2026
...Construction Place of Performance: Beaver , UT 84713 USA Description View Changes On ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 9/23/2026