UConn - Gampel Pavilion Renovation - RFQ Phase 2
DPR Construction (DPR) is the awarded Construction Manager for the Gampel Pavilion Renovations Project. The University of Connecticut (UConn) is undertaking a focused renovation to Gampel Pavilion on the Storrs campus. Gampel Pavilion is an approximately 171,000 square feet, 10,299-seat multipurpose dome that was originally constructed beginning in 1988 and opened in January 1990. Gampel Pavilion consists of four floor levels that include: the court/floor level (Activity Level), entrance/street level (Concourse Level), mechanical level (Fan Room Level) and upper concourse (Upper Level). Gampel Pavilion is the largest on-campus venue for college basketball in the New England area. The goal of this project's renovation is to modernize and create maximum efficiencies of the existing spaces in Gampel Pavilion while also further increasing new revenue generating areas and opportunities that support the facility's use. https://app.buildingconnected.com/projects/69b2d3736f59e49c830aeac4/info
Lauren Dabbs 950 Winter Street North 1st Floor Waltham MA, 02451 United States Tel: 3393683528 Fax: LaurenD@dpr.com

With GovernmentContracts, you can:
...oil-fired boiler with a new, high-efficiency oil hot water boiler. A mandatory pre-bid ...
City of Waterbury
Bid Due: 6/30/2026
..., and maintained regularly to meet the facility efficiency, environmental and food safety ...
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 6/19/2026