| Location: | Minnesota |
|---|---|
| Posted: | Jun 29, 2026 |
| Due: | Jul 14, 2026 |
| Agency: | Metropolitan Airports Commission (MAC) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | Solicitation180 |
| Publication URL: | To access bid details, please log in. |
Project Description: This project provides for the construction of infrastructure to support the future installation of aircraft docking guidance systems at eleven (11) gates located at Minneapolis-St Paul International Airport Terminal 2. Site work includes traffic control, pavement removal and replacement, installation of mounting posts and foundations, and guide post installation. Electrical work includes items to support the future equipment, but no guidance systems or installation of guidance systems are included with this project.
Approximate quantities of major items of work are as follows:
Item Description - Quantity - Unit of Measure
Concrete removal - 90 - SY
Bituminous removal - 15 - SY
Concrete Pavement - 90 - SY
Bituminous Pavement - 6 - TN
Electrical Power & Connections - 1 - LS
Conduits - 1 - LS
Mounting Posts, various styles - 11 - EA
Guide Posts - 36 - EA

With GovernmentContracts, you can:
...components, electrical equipment, power distribution, controls, and all associated incidental work... System Installation ...
Metropolitan Council
Bid Due: 10/15/2026
...of the existing obstruction light and cathodic protection system and associated hardware... of ...
WSB
Bid Due: 10/01/2026
...gaskets. * Removal of the existing obstruction light and cathodic protection system.... Associated ...
WSB
Bid Due: 10/01/2026