| Location: | Missouri |
|---|---|
| Posted: | Sep 10, 2026 |
| Due: | Oct 14, 2026 |
| Agency: | Missouri Department of Transportation(MDOT) |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
| Status | Bid Advertisement | Post Date | Revision Date | Letting Date |
| NEW | KC District, City of Marshall, grading, paving, and drainage to provide ADA compliant sidewalk from east side of Break Time on West College Street | 9/10/26 | 10/14/26 |
ADVERTISEMENT FOR BIDS
NOTICE TO BIDDERS
City of Marshall College and Miami Street Sidewalk Improvement
Located along West College Street and South Miami Avenue between Break Time on West College
Street to the east side of South Miami Avenue and south along South Miami Avenue to Vers Street in
City of Marshall, Missouri, and
WILL be received and opened publicly at the office of City of Marshall, City Hall, 214 N. Lafayette
Avenue, Marshall, Missouri 65340 at 2:00 PM. on Wednesday, October 14, 2026.
Any and all bids received after the time specified above will be returned unopened.
The proposed work consists of grading, paving, and drainage to provide ADA compliant sidewalk from
east side of Break Time on West College Street to the east side of South Miami Avenue and south along
South Miami Avenue to Vers Street.
Plans and specifications may be obtained from American Document Solutions online plan room, at
www.adsplanroom.net.
A pre-bid conference will be held at 10:00 o'clock A.M on September 30, 2026, at the City of Marshall
City Hall, 214 Lafayette Avenue, Marshall, Missouri 65340. All bidders are encouraged to attend the
pre-bid meeting.
The City of Marshall hereby notifies all bidders that it will affirmatively ensure that in any contract
entered into pursuant to this advertisement, businesses owned and controlled by socially and
economically disadvantaged individuals will be afforded full opportunity to submit bids in response to
this invitation and will not be discriminated against on the grounds of race, color, religion, creed, sex,
age, ancestry, or national origin in consideration for an award."
All bidders must be on MoDOT's Qualified Contractor List per Section 102.2 of the Missouri
Standard Specifications for Highway Construction, July 2026 including all revisions. The contractor
questionnaire must be on file 7-days prior to bid opening.
Contractors and sub-contractors who sign a contract to work on public works project provide a 10-
Hour OSHA construction safety program, or similar program approved by the Department of Labor
and Industrial Relations, to be completed by their on-site employees within sixty (60) days of
beginning work on the construction project.
A certified or cashier's check or a bid bond in the amount of 5% shall be submitted with each proposal.
All labor used in the construction of this public improvement shall be paid a wage no less than the
prevailing hourly rate of wages of work of a similar character in this locality as established by the
Department of Labor and Industrial Relations (Federal Wage Rate), or state wage rate, whichever is
higher.
The project will be awarded to the lowest, responsive, responsible bidder. The City of Marshall
reserves the right to reject any or all bids.
The DBE Goal for this project is 0.0%.
No 2nd tier subcontracting will be allowed on this project.
Advertisement dates: September 11, 2026 (The Marshall Democrat-News)

With GovernmentContracts, you can:
...placement, drainage improvements, culvert extensions 10/7/26 10/29/26 1. ADVERTISEMENT FOR BIDS Pemiscot... and ...
Missouri Department of Transportation(MDOT)
Bid Due: 10/29/2026
...Drainage Lincoln ES South Drive Lincoln ES Regrade Gravel Lincoln ES Fencing & ...
Drexel Technologies
Bid Due: 10/21/2026
...Drainage Lincoln ES South Drive Lincoln ES Regrade Gravel Lincoln ES Fencing & ...
Drexel Technologies
Bid Due: 10/21/2026
...Drainage Lincoln ES South Drive Lincoln ES Regrade Gravel Lincoln ES Fencing & ...
Drexel Technologies
Bid Due: 10/21/2026