| Location: | Vermont |
|---|---|
| Posted: | Apr 13, 2026 |
| Due: | May 4, 2026 |
| Agency: | State Government of Vermont |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
|
Bid Type: Request for Proposal Locations: Chittenden Keywords: Environmental Conservation Bid Description: The Winooski Natural Resources Conservation District is requesting proposals for the Cheesefactory Road riparian buffer planting. This project is located on two privately owned parcels in Shelburne and South Burlington, along the Muddy Brook. The project will restore land adjacent to the brook by establishing a forested riparian buffer intended to improve water quality, stabilize streambanks, and reduce nutrient loading. Phosphorus reduction estimates were developed in coordination with the Basin 8 Planner using approved state modeling tools. See bid attachment for instructions.
|
||||||||||||||||||||||

With GovernmentContracts, you can:
...: FITZGERALD ENVIRONMENTAL ASSOCIATES 164 Main Street Suite 2 Colchester , VT 05446 ...
State Government of Vermont
Bid Due: 6/19/2026
...: Storm Water System Design, Stream Restoration, Environmental Conservation, Environmental Consultant...
State Government of Vermont
Bid Due: 6/08/2026
.../2026 4:00 PM Intent To Bid Deadline: Est. Dollar Value: $0.00 RFQ Number: ...
State Government of Vermont
Bid Due: 6/10/2026
...Locations: Addison, Rutland Keywords: Stream Restoration, Environmental Conservation Bid Description...
State Government of Vermont
Bid Due: 6/18/2026