| Location: | Vermont |
|---|---|
| Posted: | Apr 13, 2026 |
| Due: | May 4, 2026 |
| Agency: | State Government of Vermont |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
|
Bid Type: Request for Proposal Locations: Chittenden Keywords: Environmental Conservation Bid Description: The Winooski Natural Resources Conservation District is requesting proposals for the Cheesefactory Road riparian buffer planting. This project is located on two privately owned parcels in Shelburne and South Burlington, along the Muddy Brook. The project will restore land adjacent to the brook by establishing a forested riparian buffer intended to improve water quality, stabilize streambanks, and reduce nutrient loading. Phosphorus reduction estimates were developed in coordination with the Basin 8 Planner using approved state modeling tools. See bid attachment for instructions.
|
||||||||||||||||||||||

With GovernmentContracts, you can:
...Number: DEC - WATER INVESTMENT DIVISION 1 National Life Drive - Davis 3 ...
State Government of Vermont
Bid Due: 10/09/2026
...), Environmental Conservation Bid Description: Windham County Natural Resources Conservation District (WCNRCD... and ...
State Government of Vermont
Bid Due: 10/02/2026
...: Grand Isle Keywords: Construction (Non Building), Landscaping, Environmental Conservation Bid... along three ...
State Government of Vermont
Bid Due: 10/07/2026
...Services, Stream Restoration, Environmental Conservation Bid Description: Site 1: Centerville Brook Dam... the ...
State Government of Vermont
Bid Due: 10/02/2026