| Location: | South Carolina |
|---|---|
| Posted: | Feb 14, 2025 |
| Due: | Feb 28, 2025 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 2025-018 |
| Publication URL: | To access bid details, please log in. |
Convert an existing shower associated with the existing men’s restroom to a new women’s restroom as located on the ground floor. Scope includes demolition of existing finishes,
plumbing fixtures, and associated utility connections for a new toilet layout.

With GovernmentContracts, you can:
...: Design-Bid-Build Construction Cost Range: n/a Agency Project Coordinator: Jamie Caggiano Email... Conference ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 7/30/2026
...Delivery Method: Design-Bid-Build Construction Cost Range: $475,000 to $575,000 Prime Contractor... to fully ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/19/2026
...systems, including HVAC, electrical, plumbing, life safety, and IT infrastructure. Project Details... systems, ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/05/2026
..., Ruffin, SC 29475 Project Delivery Method: Design-Bid-Build Construction Cost Range: $135,000-$160,000... that ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/14/2026