| Location: | Ohio |
|---|---|
| Posted: | Aug 18, 2026 |
| Due: | Sep 16, 2026 |
| Agency: | Northeast Ohio Regional Sewer District |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | EB-2512 |
| Publication URL: | To access bid details, please log in. |
Project ID: EB-2512
Title: Sheldon Road Profile Raising & Bridge Replacement
Addenda: 0
Release Date: 8/18/2026
Due Date: 9/16/2026
The Sheldon Road Profile Raising & Bridge Replacement Project (Project) is located along Sheldon Road, on the community border of Brook Park and Middleburg Heights. The project is located within the Abram Creek watershed, a tributary to the Rocky River. Local flooding occurs as early as the 2-year storm event along a portion of Sheldon Road, between Eastland Road and Engle Road, leading to impassable flooding of Sheldon Road. A contributing factor to the flooding is the existing cast-in-place reinforced concrete rigid frame (box) structure beneath Sheldon Road, which is in a state of deterioration.
The project involves the construction of a 60' single span prestressed concrete box beam bridge to replace the existing box culvert. This design will result in a bridge structure with a profile set above the 100-year water surface elevation. The Project will also involve raising the profile of a 1,060-feet length of Sheldon Road by an average of 2.97-feet (maximum elevation change 5.53-feet). The raised roadway consists of 2 - 11 ft. lanes with 2 - 4 ft shoulders, 30 ft. total width, with a 1.25 ft wide parapet that does not extend beyond the bridge approach slab. The design includes a 10 ft wide sidewalk across the north side of the bridge/approach slabs and 5 ft. sidewalk on the north roadway approaches.
The objective of this project is to address the structural deterioration of the existing box culvert and improve the conveyance of stormwater flows up to the 100-year design storm, elimination the overtopping of Abram Creek onto Sheldon Road.
The Northeast Ohio Regional Sewer District (Sewer District) protects public health and the environment by leading effective wastewater and stormwater management. As the largest wastewater treatment provider in the State of Ohio, the Sewer District spans 380 square miles, serves 62 communities and one million residents, treats 90 billion gallons of wastewater a year, and manages more than 400 miles of streams.
In addition to its award-winning treatment plant and laboratory performance, the Sewer District's Project Clean Lake construction program will reduce annual Lake Erie pollution by 4 billion gallons by 2035, while its Regional Stormwater Management Program addresses widespread inter-community problems like flooding, pollution, and erosion.
NEORSD is an Equal Opportunity Employer. We are committed to fostering a diverse and inclusive workforce, recognizing the full range of human differences and similarities. Through our unwavering efforts to leverage the potential of our diversity, we continually strive to build and foster an environment that respects each individual . We encourage and promote innovation and provide opportunities for all employees to interact, communicate, and realize the full potential of their talents.

With GovernmentContracts, you can:
...of this bid is to supply the Northeast Ohio Regional Sewer District with ...
Northeast Ohio Regional Sewer District
Bid Due: 10/06/2026
...(ET) 10/14/2026, 3:00:00 PM Delivery Date 9/15/2026 Delivery Name City of Columbus, Division ...
City of Columbus
Bid Due: 10/14/2026
...Construction,Sewer and Water Construction,Water Main (Repair/Replace) Rehabilitation,Water Resources..., Water Main (Repair/Replace) Rehabilitation, Jack ...
City of Youngstown
Bid Due: 10/09/2026
...Progressive Design-Build Project Ref. #: RFQ 275X901192 Department: Sewers Type: RFSQ Status: Open ...
City of Cincinnati
Bid Due: 10/27/2026