| Location: | Connecticut |
|---|---|
| Posted: | Nov 8, 2026 |
| Due: | Nov 19, 2026 |
| Agency: | Town of Manchester |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 26/27-20 |
| Publication URL: | To access bid details, please log in. |
Project ID: 26/27-20
Title: FURNISH AND INSTALL GENERATOR AT LOVE LANE
Addenda: 1
Release Date: 11/5/2026
Due Date: 11/19/2026
The Town of Manchester is soliciting bids to furnish and install a complete standby diesel generator at the Love Lane Pump Station. The station is a critical sewage pump station and must keep pumping, and keep its alarms, during a utility outage.
Work is turnkey and includes the generator, dual-wall sub-base tank sized for 48 hours at 100 percent of the standby rating, sound-attenuated enclosure, automatic transfer switch, concrete pad at the required flood elevation, conduit and wiring, startup, load-bank testing, training, and initial fuel fill.
The Love Lane Pump Station (90 Love Lane, Manchester, CT 06040) is a critical sewage pump station serving the Town of Manchester. Continuous operation of the station is required to prevent backups and protect public health and the environment. During a utility power outage, the station must continue to pump peak flows and maintain monitoring and alarm functions.
A September 2, 2026 load study established the electrical demands of the station, including the existing 3 HP pumps and miscellaneous loads. The study confirmed the need for a permanently installed standby diesel generator capable of starting and running the station loads within the voltage and frequency dip limits required by code, with automatic start and transfer in 10 seconds or less (NFPA 110 Level 1, Type 10).
The generator, dual-wall sub-base fuel tank, and automatic transfer switch must be installed at or above the base flood elevation plus 2 feet (or the stricter applicable elevation). On-site fuel storage must support a minimum of 48 hours of operation at 100 percent of the generator’s standby rating without refueling. Alarm contacts for generator run, fail-to-start, low fuel, high fuel, rupture basin, ATS position, and common alarm must be provided for connection to the existing station telemetry system.
This project provides a complete turnkey solution—generator, sound-attenuated enclosure, tank, transfer switch, concrete pad, wiring, startup, testing, training, and initial fuel fill—to ensure reliable emergency power for the Love Lane Pump Station in accordance with NEIWPCC TR-16, NFPA standards, and Connecticut requirements.

With GovernmentContracts, you can:
..., during a utility outage. Work is turnkey and includes the generator, dual-wall ...
Town of Manchester
Bid Due: 11/30/2026
...of existing filter tank, disconnection and reconnection of the chlorine/acid feeder, all necessary ...
State Government of Connecticut
Bid Due: 11/24/2026
...Tank, drawing water from the East Well through three greensand media pressure filters. ...
State Government of Connecticut
Bid Due: 12/09/2026
...and the Carpenter Avenue Tank, drawing water from the East Well through three ...
City of Meriden
Bid Due: 12/15/2026