| Location: | North Carolina |
|---|---|
| Posted: | Mar 19, 2026 |
| Due: | Apr 2, 2026 |
| Agency: | State Government of North Carolina |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 173-26005 |
| Publication URL: | To access bid details, please log in. |
| Solicitation Number: | 173-26005 |
| Project Title: | Seventy-First High School Auditorium HVAC/Lighting/Lay-In Ceiling Replacement |
| Description: | The general scope of work will consist of the installation of (2) 15 ton packaged heat pumps on the auditorium roof with electrical as required. Work also includes Schneider Controls and BAS Interface, duct detectors by JCI, roofing work, along with new ceiling grid, and LED lighting. |
| Opening Date: | 4/2/2026 2:00 PM |
| Posted Date: | 3/20/2026 |
| Status: | Open |
| Department: | CUMBERLAND COUNTY BOARD OF EDUCATION |
|
Solicitation Number
*
173-26005
|
Department
CUMBERLAND COUNTY BOARD OF EDUCATION
|
Status Reason
Open
|
|
|
Opening Date
2026-04-02T14:00:00.0000000
|
Posted Date
*
2026-03-19T22:46:50.0000000Z
|
Primary Commodity Code
Construction Services
|
|
|
Mandatory Conference/Site Visit
2026-03-19T04:00:00.0000000Z
|
Special Instructions
Contractors interested in bidding shall meet at 1:30pm on March 19, 2026, at Seventy-First High School, 6764 Raeford Rd, Fayetteville, NC 28304.
|
Solicitation Type
*
Select RFP IFB RFI
|
|
|
Owner
Susan Riddle
|
|||
|
Description
The general scope of work will consist of the installation of (2) 15 ton packaged heat pumps on the auditorium roof with electrical as required. Work also includes Schneider Controls and BAS Interface, duct detectors by JCI, roofing work, along with new ceiling grid, and LED lighting.
|
|||

With GovernmentContracts, you can:
..., such as but not limited to smoke detectors, horns, strobes, heat detectors, ...
County of Carteret
Bid Due: 6/10/2026