B01-26 School St. Water Main Cleaning & Lining
|
| Category: | Contractor Services |
| Status: | Open |
|
B01-26
City of Concord, New Hampshire
Purchasing Division
CIP 84
WATER MAIN CLEANING & LINING PROJECT
SCHOOL STREET
Prepared by, and in coordination with the
COMMUNITY DEVELOPMENT DEPARTMENT
ENGINEERING SERVICES DIVISION
Proposal Documents
Contract Documents
Specifications
BID DUE DATE/TIME: APRIL 15, 2026 NOT LATER THAN 2:00 PM
NON-MANDATORY PRE-BID MEETING DATE/TIME:
MARCH 26, 2026 AT 10:00 AM
TABLE OF CONTENTS
TABLE OF CONTENTS ................................................................................................................ 2
INVITATION FOR BIDS .............................................................................................................. 3
INSTRUCTIONS TO BIDDERS ................................................................................................... 6
GENERAL TERMS AND CONDITIONS .................................................................................... 8
ENGINEERING SUPPLEMENTAL TERMS AND CONDITIONS ............................................ 8
SCOPE OF WORK ....................................................................................................................... 16
BID SUBMISSION CHECKLIST ............................................................................................... 18
BID FORM ................................................................................................................................... 19
ITEMIZED BID SHEETS ............................................................................................................ 21
QUALIFICATIONS STATEMENT ............................................................................................ 27
INSURANCE REQUIREMENTS FOR ALL CONTRACTORS ................................................ 28
NO BID QUESTIONNAIRE ........................................................................................................ 29
NOTICE OF AWARD .................................................................................................................. 30
AGREEMENT .............................................................................................................................. 32
NOTICE TO PROCEED .............................................................................................................. 35
BID BOND ................................................................................................................................... 36
PAYMENT BOND ....................................................................................................................... 37
PERFORMANCE BOND ............................................................................................................. 38
CONTRACTORS AFFIDAVIT ................................................................................................... 39
CONTRACTORS RELEASE ....................................................................................................... 40
CERTIFICATE OF SUBSTANTIAL COMPLETION ................................................................ 42
CHANGE ORDER ....................................................................................................................... 43
WORK CHANGE DIRECTIVE................................................................................................... 45
CONSENT OF SURETY COMPANY ........................................................................................ 47
CONTRACTOR'S FINAL LIEN WAIVER ................................................................................. 48
CERTIFICATE OF FINAL COMPLETION OF WORK ............................................................ 50
TECHNICAL REFERENCES ...................................................................................................... 52
SPECIAL PROVISIONS .............................................................................................................. 53
B01-26 CIP 84 School St. Water Main Cleaning & Lining Project Page 2 of 90
City of Concord, New Hampshire
PURCHASING DIVISION
COMBINED OPERATIONS & MAINTENANCE FACILITY
311 NORTH STATE STREET
CONCORD, NH 03301
603-230-3664 FAX: 603-230-3656
www.concordnh.gov
INVITATION FOR BIDS
The Purchasing Division, located at the Combined Operations and Maintenance Facility,
311 North State Street, Concord, New Hampshire 03301, will receive sealed Bids for B01-26,
"CIP 84 WATER MAIN CLEANING & LINING PROJECT, SCHOOL STREET" until 2:00
PM on April 15, 2026 at which time and place they will be opened and publicly read. The sealed
envelope should be plainly marked:
B01-26
CIP 84
WATER MAIN CLEANING & LINING PROJECT, SCHOOL STREET
Concord, NH
Bids may be issued only by the Purchasing Manager, or his/her designee, to authorized firms and
are not transferable unless authorized by the Purchasing Manager, or his/her designee.
Plans and specifications may be downloaded at no charge from the City of Concord, New
Hampshire FTP site at https://ftp.concordnh.gov; Account: vendor; Password: Concord1.
Plans and specifications are not available in hard copy.
Each bid shall be accompanied by a certified check, cash, check drawn by a New Hampshire
bank, or bid bond for and subject to conditions provided in the Instruction to Bidders. The
amount of such bid deposit shall be ten percent (10%) of the total bid, made payable to the City
of Concord, New Hampshire.
A mandatory pre-bid informational meeting will be held at 10:00 AM on Thursday, March
26 at the City of Concord, City Hall, 2nd Floor Conference Room, 41 Green Street,
Concord, NH 03301.
The successful bidder will be required to furnish a performance bond and a separate payment
bond each in the amount of one hundred percent (100%) of the contract price.
Progress Payments: On not later than the last day of every month, the Contractor shall prepare
and submit an invoice covering the total quantities of work that have been completed from the
B01-26 CIP 84 School St. Water Main Cleaning & Lining Project Page 3 of 90
start of the job up to and including the last day of the preceding month together with such
supporting evidence as required by the CITY.
Retainage: The CITY shall retain a portion of the progress payments, each month, in accordance
with the following procedures:
1. Until work is 50% complete, as determined by the CITY, retainage shall be 10% of the
monthly payments claimed. The computed amount of retainage shall be deposited in a non-
interest-bearing account established by the CITY.
2. After the work is 50% complete, and provided the Contractor has satisfied the CITY in
quality and timeliness of the work, and provided further that there is no specific cause for
withholding additional retainage no further amount shall be withheld.
3. Upon substantial completion, the amount of retainage shall be reduced to 2% of the total
contract price plus an additional retainage based on the CITY's estimate of the fair value of
the punch list items and the cost of completing and/or correcting such items of work, with
specified amounts for each incomplete or defective item of work. As these items are
completed or corrected, they shall be paid out of the retainage until the entire project is
declared completed. The final 2% retainage shall be held, in the non-interest-bearing
account, during the two-year warranty period and released only after the CITY has accepted
the project.
Liquidated Damages: In the event that the Contractor fails to satisfactorily complete the work
contemplated and provided for under this contract, on or before the date of completion
September 25, 2026, the CITY shall deduct from the payments due the Contractor each month,
the sum of one thousand dollars ($1,000.00) plus engineering charges per day for each
calendar day of delay, which sum is agreed upon not as a penalty, but as fixed and liquidated
damages for each day of such delay, to be paid in full and subject to no deduction. If the
payments due the Contractor are less than the amount of such liquidated damages said damages
shall be deducted from any other monies due or to become due the Contractor or shall be paid by
the Contractor's surety.
The CITY reserves the right to reject any or all bids or any part thereof, to waive any formality,
informality, information and/or errors in the proposal, to accept the proposal considered to be in
the best interest of the CITY, or to purchase on the open market if it is considered in the best
interest of the CITY to do so.
Failure to submit all information as detailed on the Bid Submission Checklist and/or submission
of an unbalanced bid are sufficient reasons to declare a proposal as non-responsive and subject to
disqualification.
B01-26 CIP 84 School St. Water Main Cleaning & Lining Project Page 4 of 90
| Name | Advertising Medium | Address | Phone/Fax | Email and Web Address |
|---|---|---|---|---|
| City of Concord, NH | Posted on City Website and in City Hall Lobby | 311 North State Street, Concord NH 033301 | 603.230-3664 603.230.3656(fax) | twaterman@concordnh.gov www.concordnh.gov/purchasing |
| Associated General Contractors | Bid House | 48 Grandview Drive, Bow NH 03304 | 603.225.2701 603.226.3859(fax) | plansroom@agcnh.org www.agcnh.org |
| Construction Summary of NH | Bid House | 734 Chestnut St, Manchester NH 03104 | 603.627.8856 603.627.4524(fax) | info@constructionsummary.com www.constructionsummary.com |
| Bid Ocean | Bid House | PO Box 40445, Grand Junction, CO 81501 | 866.347.9657 877.356.9704(fax) | bids@bidocean.com www.bidocean.com |
| Dodge Data & Analytics | Bid House | 300 American Metro Blvd, Suite 185, Hamilton, NJ 08619 | 607.898.2053 | dodge.bidding@construction.com www.construction.com |
| New England Construction News - CDC News | Bid House | 100 Radnor Rd S- 102, State College, PA 16801 | 1.800.652.0008 1.888.285.3393(fax) | ENR.products@bnpmedia.com www.enr.com |
All bids are advertised, at the CITY's discretion, in various publications and are posted publicly
as detailed below:
Name Advertising Address Phone/Fax Email and Web Address
Medium
City of Concord, Posted on 311 North State 603.230-3664 twaterman@concordnh.gov
NH City Website Street, Concord NH 603.230.3656(fax) www.concordnh.gov/purchasing
and in City 033301
Hall Lobby
Associated Bid House 48 Grandview 603.225.2701 plansroom@agcnh.org
General Drive, Bow NH 603.226.3859(fax) www.agcnh.org
Contractors 03304
Construction Bid House 734 Chestnut St, 603.627.8856 info@constructionsummary.com
Summary of NH Manchester NH 603.627.4524(fax) www.constructionsummary.com
03104
Bid Ocean Bid House PO Box 40445, 866.347.9657 bids@bidocean.com
Grand Junction, CO 877.356.9704(fax) www.bidocean.com
81501
Dodge Data & Bid House 300 American Metro 607.898.2053 dodge.bidding@construction.com
Analytics Blvd, Suite 185, www.construction.com
Hamilton, NJ 08619
New England Bid House 100 Radnor Rd S- 1.800.652.0008 ENR.products@bnpmedia.com
Construction 102, State College, 1.888.285.3393(fax) www.enr.com
News - CDC PA 16801
News
APPROVED:
CITY OF CONCORD, NEW HAMPSHIRE
__________________________________________
Tina M. Waterman, Purchasing Manager
Date: March 19, 2026
B01-26 CIP 84 School St. Water Main Cleaning & Lining Project Page 5 of 90
INSTRUCTIONS TO BIDDERS
B01-26, CIP 84 WATER MAIN CLEANING & LINING PROJECT
SCHOOL STREET
CONCORD, NH
1. EXPLANATION TO BIDDERS:
Any explanation regarding the meaning or interpretation of contract drawings, specifications or
other contract documents must be requested in writing with sufficient allowance of time for
receipt of reply (at least seven (7) calendar days) before the time of the bid opening. Any such
explanations or interpretations shall be made in the form of an addendum to the documents and
shall be furnished to all bidders who shall submit all addenda with their bids. Oral explanations
and interpretations made prior to the bid opening shall not be binding. Requests for explanations
should be addressed to:
Tina M. Waterman, Purchasing Manager
Combined Operations & Maintenance Facility
311 North State Street
Concord, NH 03301
(603) 230-3664
(603) 230-3656 (Fax)
twaterman@concordnh.gov
2. PRE-BID MEETING:
A non-mandatory pre-bid informational meeting has been scheduled for 10:00 am Thursday
March 26, 2026 at the City of Concord, City Hall, 2nd Floor Conference Room, 41 Green Street,
Concord, NH 03301.
3. BIDDERS UNDERSTANDING:
The Contractor acknowledges that they have visited the work site and familiarized themselves
with pertinent local conditions such as location, character, accessibility, existing work, and labor
conditions.
The City of Concord shall make available to all prospective bidders, previous to the receipt of
bids, information that it may have as to the extraordinary site conditions at the work site. Such
information shall be given, however, as the best factual information available without the
assumption of responsibility for its accuracy or for any conclusions that the contractor might
draw there from.
4. QUALIFICATIONS OF BIDDER:
The City of Concord may make such investigations as it deems necessary to determine the ability
of the bidder to perform the work, and the bidder shall furnish to the City all such information
B01-26 CIP 84 School St. Water Main Cleaning & Lining Project Page 6 of 90
and data for this purpose as the City may request. The City reserves the right to reject any bid if
the evidence submitted by, or investigation of such bidder fails to satisfy the City that such
bidder is properly qualified to carry out the obligations of the contract and to complete the work
contemplated therein. Conditional bids will not be accepted.
5. BID BOND REQUIREMENTS:
Security required shall be submitted with the bid and failure to submit same may be cause for
rejection. The bidder, at his/her option, shall furnish a certified check drawn by a New
Hampshire bank, cash, or a bid bond as security in the amount required. Security deposited by
unsuccessful bidders will be returned as soon as practicable after the opening.
6. CONTRACTS, BONDS, AND INSURANCE:
The successful bidder shall enter into a written Contract with the City of Concord within the time
specified by the bid. A performance bond and a separate payment bond in the amount of 100
percent (100%) of the contract price shall be furnished at the time of signing the formal
Agreement. The Contractor shall secure and maintain the insurance policies required under this
Contract.
7. TIME OF COMPLETION:
The successful Contractor agrees to commence work within a set amount of time after the
written Notice to Proceed as agreed upon by the City and the Contractor and that the date of final
completion, with such extensions as approved in writing by the City, shall be no later than
Friday September 25, 2026.
8. BID DUE DATE AND TIME:
Bids are due to the Purchasing Manager at 311 North State St, Concord, NH no later than 2:00
pm Wednesday, April 15, 2026.
B01-26 CIP 84 School St. Water Main Cleaning & Lining Project Page 7 of 90
GENERAL TERMS AND CONDITIONS
To view the City of Concord's full terms and conditions for this project please visit
https://concordnh.gov/DocumentCenter/View/15425/BID-General-Terms-and-
Conditions?bidId=
Unless any exceptions to the City's General Terms and Conditions are expressly stated on the
enclosed Specifications Exception Form, the vendor shall accept the City's General Terms and
Conditions as written.
ENGINEERING SUPPLEMENTAL TERMS AND CONDITIONS
1. INSPECTION FEES:
The Contractor (or subcontractor if used) shall not be assessed fees for layout or inspection of
work by City of Concord personnel, when such layout and/or inspection is required as part of the
Specifications for the project. If, however, additional layout and/or re-establishment of bench
marks, etc. is required due to negligence or failure of the Contractor to conform to the
Specifications and Standards, then charges shall be made to him, and shall not be reimbursable
by the City. The Contractor may be assessed the additional expense for inspection work during
overtime or weekend hours should these hours be solely at the convenience of the Contractor.
2. OPPORTUNITIES FOR RESIDENTS:
The Contractor covenants and agrees that in the work to be performed under this Contract, the
Contractor will take affirmative action to ensure that residents of the City of Concord are given
maximum opportunity for employment and that business concerns located in, or owned in
substantial party by, residents of the City of Concord are to the greatest extend feasible, awarded
contracts.
The City may request, in which case the Contractor shall provide, such information as the Owner
shall determine is necessary to ascertain the Contractor's conformance with the provisions of this
section.
3. EXTRA WORK:
The Contractor shall do any work incidental to the proper completion of the contract not herein
otherwise provided for when and as ordered in writing by the City. The amount of compensation
to be paid to the Contractor for extra work as so ordered, shall be determined by the City to be
one of the following:
1. By such applicable unit prices, if any, as set forth in the Contract;
2. or if no such unit prices are so set forth, then by unit prices or by a lump sum
mutually agreed to by the City and the Contractor; or
B01-26 CIP 84 School St. Water Main Cleaning & Lining Project Page 8 of 90
3. If no such unit prices are so set forth and if the parties cannot agree upon unit
prices or a lump sum, then by the actual net cost in money to the Contractor as
approved by the City of the materials and of the wages of applied labor required
for such extra work, plus such rental of plant and equipment (other than small
tools) required and approved for such extra work, plus ten percent (10%). No
extra work will be paid for unless specifically ordered as such by the City in
writing.
4. In the case of extra work performed by subcontractors, whether under the specific
contract item provided herein, or otherwise approved by the City, the ten percent
(10%) added to the reasonable cost of the work will be allowed only to the
subcontractor. On such work, an additional five percent (5%) of the reasonable
cost (before addition to the ten percent -10%) will be paid to the Contractor for
his work in directing the operations of the subcontractor and for any overhead
involved.
4. THE CITY ENGINEER TO DECIDE:
The City Engineer shall decide all questions which may arise as to the performance, continuity
and acceptability of work to be done and all materials to be furnished under this contract, and
shall decide all questions which may arise as to the interpretation of plans and specifications
used and as to the fulfillment of this contract on the part of the Contractor and as to defects in the
Contractor's work. The order, progress and methods of construction shall at all times be
satisfactory to the City Engineer. The contractor shall vie his attention constantly to the faithful
prosecution of the work, and shall keep the same under his personal control.
5. TIME AND MANNER OF DOING THE WORK:
Before any work is begun, the Contractor shall discuss fully with the City Engineer the order and
manner of doing the work and the operating procedure shall at all items comply with the
requirements of City Engineer. Care should be taken to keep private and commercial entrance
(i.e. service roads and walkways) interruptions to a minimum and advance notice should be
given the occupant when such interruptions are anticipated.
6. GENERAL PROVISIONS:
Whenever the Contractor is not present on any part of the work where it may be desired to give
directions, orders may be given by the City Engineer and shall be received and obeyed by the
superintendent or foreman who may have charge of the particular work in reference to which
orders are given.
7. EXISTING STRUCTURES:
The Contractor shall take full responsibility for maintaining and restoring all existing structures
encountered by his construction operations, including but not limited to paving, catch basins,
drains, electric lights, utility conduits, utility poles, telephone lines, electric lines, CATV lines,
B01-26 CIP 84 School St. Water Main Cleaning & Lining Project Page 9 of 90
fire alarm lines, gas mains and any other structures encountered above or below ground.
Damage to utilities will be repaired by the respective utility and the Contractor will pay all cost
of repairs and/or damage incurred. The Contractor shall receive no additional compensation for
maintaining, supporting, protecting, restoring, and relocating if necessary, all electric, CATV,
fire alarm, and telephone poles and lines, and gas mains which are encountered in his work.
8. MAINTAIN STREETS PASSABLE:
Unless otherwise specifically permitted by the proper authorities of the City, the Contractor shall
at all times maintain the streets passable on which he is conducting his work. The Contractor
shall maintain access to all houses, garages, etc., with the least possible interruption and shall
conduct his work so that the inconvenience to all property owners adjacent to the work will be at
a minimum. All property owners shall be notified in advance if access to their property is to be
temporarily interrupted in case of any hardship resulting there from; the Contractor shall make
suitable arrangements with the property owner to the satisfaction of the City Engineer.
9. PERMITS:
The Contractor shall secure all necessary permits from the state, city authorities having
jurisdiction in the streets or highways and all other necessary building and construction
operations requiring permits, and he will be required to repair any damage caused by his
operations to any street, highway or existing structure either above or below ground surface.
10. USE OF HIGHWAYS:
The use of state, city and town highways for hauling construction equipment or materials
involved in the work will be subject to the rules and regulations of the state highway department,
city or town governing such use by contractors and the Contractor shall comply with all such
rules and regulations.
11. BARRICADES, DANGER, WARNING AND DETOUR SIGNS:
The Contractor shall provide, erect and maintain all necessary barricades, suitable and sufficient
warning lights, danger signals and signs, provide flaggers in numbers as required, and shall take
all necessary precautions for the protection of the work and the safety of the public. The
Contractor will be required to conduct all operations so as to keep traffic moving steadily and to
avoid traffic tie-ups. Highways closed to traffic shall be protected by adequate barricades on
which suitable and acceptable warning and detour signs shall be placed and maintained. As a
further precaution, the Contractor shall keep, from any city land or easements at the site of work,
all persons not directly connected with the work or authorized by the City Engineer to be in the
work area.
12. ACCESS TO WORK:
Authorized agents and employees of the city may, at any time and for any purpose, enter upon
the work and premises used by the Contractor, and the Contractor shall provide safe and proper
B01-26 CIP 84 School St. Water Main Cleaning & Lining Project Page 10 of 90

With GovernmentContracts, you can:
Supply and delivery one Zodiac boat with motor and one Trailer for the
Town of Merrimack
Bid Due: 8/06/2026
Timbersale and Cut - Watkins Town Forest - Lawrence Rd , due Friday,
Town of Merrimack
Bid Due: 8/07/2026
Follow MWF FHQ Roof Improvement Active Contract Opportunity Notice ID 12445526Q0067 Related Notice
AGRICULTURE, DEPARTMENT OF
Bid Due: 8/17/2026
Bid Title: Conceptual Design and Feasibility Study - 7.2 kV Submarine Cable Interconnection
Town of Wolfeboro
Bid Due: 8/13/2026