| Location: | Missouri |
|---|---|
| Posted: | Feb 24, 2026 |
| Due: | Apr 24, 2026 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | W912P926RA001 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
***Amendment 0001
This amendment is issued to make administrative updates to the solicitation.
***Proposal will be submitted via EMAIL Angie Grimes at angie.l.grimes@usace.army.mil and Whitney Dee at whitney.r.dee@usace.army.mil
The U. S. Army Corps of Engineers, St. Louis District, is seeking a firm to furnishing all equipment, labor, operators, supervision/site superintendent, quality control, supplies, materials, and incidentals necessary to satisfactorily perform and provide construction activities of lock foundation and site preparation work. The lock foundation work establishes the lock wall and floor foundation. It consists of excavation and disposal of existing scour protection riprap that was part of previous scour hole emergency repair, dredging of sand fill, placement of sand fill in the proposed lock foundation, and placement of riprap berm. Work also includes the construction of a separator wall that will separate the river side riprap berm from the dredged sand that will be placed as foundation material for the future river wall monoliths and lock floor. The separate wall will be a sheet pile wall braced with piles. This effort also includes a deflector on the downstream side of the dam to route water flowing through the tainter gated dam adjacent to the river walls around the sheet pile separator wall. For the site preparation work, additional dredge borrow will be placed upland for a future staging and laydown area and a sanitary outfall pipe will be installed.

With GovernmentContracts, you can:
...Bid Information Type Request for Proposal Status Issued Number RFP2027-07 (On-Call Construction... is ...
City of St. Joseph
Bid Due: 8/25/2026
...Bid #: 2026BID000159 Sponsor: Supply Division Start Date: 04/15/2026 02:42 PM Closing Date: ...
City of St. Louis
Bid Due: 8/11/2026
...Number: 686078 Title: 27-SB-686078-GH Community Mobility Hubs Construction Type: Solicitation All...
St. Louis region
Bid Due: 8/27/2026
..., Roadway resurfacing, construction of a roundabout intersection, storm sewer replacement, etc. 7/1/26... ...
Missouri Department of Transportation(MDOT)
Bid Due: 8/12/2026