Town of Fort Mill Doby Bridge Park Removal and Replacement of Exterior Steps Project RFP 500-154

Location: South Carolina
Posted: Mar 19, 2026
Due: Apr 13, 2026
Agency: Fort Mill town
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
Solicitation No: RFP 500-154
Publication URL: To access bid details, please log in.
Bid Number: RFP 500-154
Bid Title: Town of Fort Mill Doby Bridge Park Removal and Replacement of Exterior Steps Project RFP 500-154
Category: Services/Supplies
Status: Open
Bid Recipient: Phillip Aycock, Town of Fort Mill Procurement Manager
Description:

The Town of Fort Mill is seeking qualified contractors to remove, dispose of, and replace the existing wooden exterior steps located on the side of the Park and Recreation building at Doby’s Bridge Park with a new metal stair system. The intent of this project is to improve safety, durability, and long-term maintenance by replacing the aging wooden steps with a permanent metal structure suitable for outdoor public facility use.

Publication Date/Time:
3/19/2026 4:00 PM
Closing Date/Time:
4/13/2026 2:00 PM
Submittal Information:
Mail in, drop off or Attend Bid Opening
Pre-bid Meeting:
Mandatory Pre Bid Meeting
Contact Person:
Brown Simpson at bsimpson@fortmillsc.gov or 803-242-0381
Related Documents:

Attachment Preview

Town of Fort Mill Doby Bridge Park Removal and
Replacement of Exterior Steps Project RFP 500-154
The Town of Fort Mill is seeking qualified contractors to remove, dispose of, and replace the existing
wooden exterior steps located on the side of the Park and Recreation building at Doby’s Bridge Park
with a new metal stair system. The intent of this project is to improve safety, durability, and long-term
maintenance by replacing the aging wooden steps with a permanent metal structure suitable for
outdoor public facility use.
Mandatory Prebid Meeting
Monday, March 30, 2026
@ 11:00 am
Doby Bridge Park
1905 North Doby’s Bridge Road
Fort Mill, SC 29715
Bid Opening
Monday, April 13, 2026
@ 2:00 pm
205 North White Street
Fort Mill, SC 29715
(If delivering in person please
wait in the lobby or drop off
with receptionist)
1
Scope of Work
1. Project Description
The Town of Fort Mill is seeking qualified contractors to remove, dispose of, and replace the existing
wooden exterior steps located on the side of the Park and Recreation building at Doby’s Bridge Park
with a new metal stair system. The intent of this project is to improve safety, durability, and long-term
maintenance by replacing the aging wooden steps with a permanent metal structure suitable for
outdoor public facility use.
The contractor shall furnish all labor, materials, equipment, supervision, transportation, and incidentals
necessary to complete the work in accordance with the requirements outlined in this solicitation.
2. Scope of Services
2.1 Site Verification
Prior to beginning work, the contractor shall visit the site to verify all measurements, conditions, and
attachment points associated with the existing stair structure. Submission of a bid shall indicate the
contractor has familiarized themselves with the site conditions.
2.2 Removal and Disposal of Existing Structure
The contractor shall:
Carefully dismantle and remove the existing wooden steps, including treads, stringers, handrails,
fasteners, and any associated components.
Protect the existing building structure, foundation, and surrounding property during removal
activities.
Remove all debris and construction waste from the site.
Properly dispose of all materials offsite in accordance with local, state, and environmental
regulations.
2.3 Fabrication and Installation of New Metal Stair System
The contractor shall furnish and install a new exterior metal stair system designed for commercial or
municipal outdoor use. At a minimum, the stair system shall include:
Structural metal stringers or frame capable of supporting required loads
Slip-resistant metal treads suitable for exterior use
Code-compliant handrails and guardrails
Anchoring hardware and structural connections appropriate for attachment to the existing
building
2
Corrosion-resistant coating or finish (such as galvanized or powder-coated steel) designed for
long-term outdoor durability
The stair system shall be installed level, secure, and in full compliance with applicable building codes and
safety standards.
3. Site Protection and Safety
The contractor shall be responsible for maintaining a safe work environment and protecting park
visitors, Town staff, and property during the project. This includes:
Installation of temporary barriers, caution tape, or signage as necessary
Maintaining clear access routes around the work area
Compliance with all applicable OSHA safety regulations
4. Cleanup and Site Restoration
Upon completion of the installation, the contractor shall:
Remove all construction debris, packaging materials, and unused supplies from the site
Restore the surrounding area to a clean and safe condition
Ensure the site is ready for normal public use
5. Compliance Requirements
All work performed under this contract shall comply with:
Applicable local, state, and federal building codes
OSHA safety regulations
Applicable South Carolina construction standards
Manufacturer specifications for the stair system and materials
All materials used shall be new, commercial-grade, and suitable for outdoor municipal use.
6. Final Inspection and Acceptance
Upon completion of the work, the contractor shall notify the Town of Fort Mill for final inspection. The
project will be considered complete when the Town determines that all work has been performed in
accordance with the contract requirements and the stair system is safe, stable, and fully operational.
3
All proposals shall be addressed and/or delivered in a sealed envelope to:
Town of Fort Mill
205 North White Street
Fort Mill, SC 29715
Attn: Phillip Aycock, Procurement Manager RFP 500-154
Proposals will be received by 2:00 p.m. (Eastern Time) on April 13, 2026. Any bid received after the
appointed time and date will not be opened or considered and will be returned to the bidder.
Town Contacts
Questions regarding insurance should be directed to Phillip Aycock at paycock@fortmillsc.gov or 803-
547-2116, to make appointments to inspect the properties please contact Brown Simpson at
bsimpson@fortmillsc.gov or 803-242-0381.
Non-Appropriation of Funds
This Agreement shall be subject to the availability and appropriation of funds by Management, and
Town Council. If the Council does not appropriate the funding needed by the Town to make payments
under this Agreement for a given fiscal year, the Town will not be obligated to pay amounts due beyond
the end of the last fiscal year for which funds were appropriated. No act or omission by the Town, which
is attributable to non-appropriation of funds, shall constitute a breach of or default under this
Agreement.
Bid Cancellation
Cancellation An Invitation for Bids, a Request for Proposals, a Request for Qualifications, or other
solicitation may be cancelled, or any or all bids or proposals may be rejected in whole or in part as may
be specified in the solicitation, when it is in the best interest of the Town. The reasons therefor shall be
made part of the contract file.
4
Compliance with Law
The selected consultant and its agents and employees shall be bound and comply with all federal, state,
and local laws, ordinance rules and regulations, as well as all other governing bodies having legal
jurisdiction with respect to the area where such work is performed.
Disqualification and Rejection of Quotations
Town of Fort Mill reserves the right to reject any consultant who has failed to perform satisfactorily, or
complete on time, or in a manner inconsistent with the bid documents, contract of similar nature, or to
reject the RFP of a consultant who is not able to perform such contract satisfactorily. The Town
expressly reserves the right to award the contract to the consultant that best meets the requirements as
set forth herein which is in the best interest of the Town, and it’s need. This solicitation does not
commit the Town of Fort Mill to award a contract, to pay any cost incurred in the preparation of a
proposal, or to produce or contract for services. A respondent may not alter the RFQ or its components.
The Town of Fort Mill reserves the right to accept or reject any or all proposals received as a result of
the Request for Proposal, or to cancel it in part or in its entirety if it is in the best interest of the Town of
Fort Mill. The Town reserves the right to change the solicitation schedule or issue amendments to the
solicitation at any time. All respondents submitting qualifications agree to abide by all relevant
provisions of the South Carolina Code of Laws as they apply.
Excluded Bidders
Bids from vendors/contractors with prior poor performance; quality issues, contact conformance,
payment history, timeline compliance, or any other reason the Town deems POOR PERFORMANCE will
not be considered. Excluded Vendors/Contractors can resubmit complete company information with
references for the Town review after a minimum of one year from the last excluded bid. The Town will
contact Vendor/Contractor with its decision within 30 days of company information submittal. The Town
reserves the right to include or exclude said Vendor/Contractor based on findings.
5
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Project Name: Fort Fremont Stairs and Rails Design/Build Agency/Owner: Beaufort County Ad Publish...: ...

State of South Carolina - State Fiscal Accountability Authority(SFAA)

Bid Due: 7/02/2026

...Project ID: Title: Fort Fremont Stairs and Rails Design/Build Addenda: 0 Release Date: ...

Beaufort County

Bid Due: 7/02/2026

...Project Name: TCTC - Critical Parking Repairs and Maintenance - Lot B Stairs ...

State of South Carolina - State Fiscal Accountability Authority(SFAA)

Bid Due: 6/18/2026

...and removal of the existing generator, pad, access stairs and platform, minor grading, ...

North Charleston Sewer District

Bid Due: 6/16/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.