PPF – South Partial Parallel Taxiway - Parsons, KS

Location: Missouri
Posted: Apr 14, 2026
Due: Apr 16, 2026
Agency: Drexel Technologies
Type of Government: State & Local
Category:
  • F - Natural Resources and Conservation Services
Publication URL: To access bid details, please log in.
PPF – South Partial Parallel Taxiway - Parsons, KS
PARSONS TRI-CITY AIRPORT | AIP Project No. 3-20-0067-016/017/018/019-2026
StatusAccepting Bids
Prebid Date 3/31/26 10:00am
Bid Date 4/16/26 10:00am
Company & Contacts
Burns & McDonnell
Ryan Lorton
816-447-9822
Location

Parsons, KS

Date Issued: 3/26/2026

PARSONS, KANSAS
PARSONS TRI-CITY AIRPORT
AIP Project No. 3-20-0067-016/017/018/019-2026
BMcD Project No. 187829

Sealed bids subject to the conditions and provisions presented herein will be received until 10:00 am (CT), April 16, 2026, and then publicly opened and read at City Hall, 112 S 17th Street, Parsons, Kansas, 67357, for furnishing all labor, materials, equipment and performing all work necessary to: South Partial Parallel Taxiway.

All proposals must be received at the address indicated herein above prior to the time and date specified for bid opening. Bids received after the specified time and date of the bid opening will be returned unopened. The City of Parsons, Kansas shall not be held responsible or accountable for delays in the delivery of any proposals by the U.S. Postal Service or other courier service.

Copies of the bid documents including project drawings and technical specifications are on file and may be inspected at:

City of Parsons, Kansas (Owner)
112 S 17th Street
Parsons, Kansas 67357

Burns & McDonnell Engineering Company, Inc.
(Engineer)
9400 Ward Parkway
Kansas City, Missouri 64114
816-333-9400

Drexel Technologies
10840 W. 86th Street
Lenexa, KS 66214
913-371-4430
www.drexeltech.com

A complete set of bid documents can be purchased for a non-refundable fee online at projectbids.drexeltech.com in their online plan room, additional assistance is available at distribution@drexeltech.com .  Information regarding this project can be found in the “Public Jobs” link on Drexel Technologies’ website. Documents may be picked up at Drexel Technologies on a CD or may be Downloaded Electronically. Bid documents will be shipped only if the requesting party assumes responsibility for all related charges. Corporate, certified or cashier’s checks shall be made
payable to Drexel Technologies, Inc. All purchases are nonrefundable and drawings and specifications need not be
returned.

Technical questions and requests for clarifications shall be submitted in writing (via email) to the Engineer no later than 7 calendar days prior to the Bid Opening Date.  Questions and clarifications shall be submitted to:  Ryan Lorton, 9400 Ward Parkway, Kansas City, Missouri 64114, Phone: 816-447-9822, Email: rblorton@burnsmcd.com .

A non-mandatory prebid conference for this project will be held at 10:00 AM, March 31st, 2026, at the Parsons Tri-City Airport, 163 24000 Rd, Cherryvale, KS 67335.

Contract Work Items.  This project will involve the following work items and estimated quantities. Prospective Bidders are hereby advised that the quantities indicated herein are approximate and are subject to change. (See next page for project quantities)

The primary purpose of this project is to construct a partial parallel taxiway at Parsons Tri-City Airport in Parsons, Kansas. The project is split into two phases, separated by the runway safety area boundary. Work outside of the safety area boundary will be completed to the extent possible while the runway is open. Work within the runway safety area will be completed during periods when the runway is closed. The scope of this design includes the installation of pavement with tie-in at the existing turnaround and Runway 17-35, drainage infrastructure, airfield striping, guidance signs, and new taxiway edge lighting.

Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

..., furnishing of materials, tools, equipment and labor necessary to construct west Meyer ...

Missouri Department of Transportation(MDOT)

Bid Due: 6/25/2026

...includes the furnishing of materials, tools, equipment and labor necessary to construct WEST ...

St. Charles County

Bid Due: 6/25/2026

...Unrestricted, Firm-Fixed-Price, Design-Bid-Build, construction contract to construct a Radio Frequency...: The scope of ...

DEPT OF DEFENSE

Bid Due: 6/15/2026

...-Build, construction contract to construct a Radio Frequency/Measurements Hangar Facility with one... is ...

DEPT OF DEFENSE

Bid Due: 6/16/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.