| Location: | Minnesota |
|---|---|
| Posted: | Oct 10, 2024 |
| Due: | Oct 21, 2024 |
| Agency: | State Government of Minnesota |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Virginia Headquarters – Building Envelope Commissioning - REPOSTED
Brief description: The New Virginia Headquarters is subject to the B3 guidelines. A critical component to a durable and energy efficient building is a well-designed and constructed exterior envelope. The best way to achieve performance targets during construction is to assure that an expert with technical knowledge of the design and installation of the systems being proposed for the building is integrated into the design process and to visually observe the installation of the work in addition to ongoing testing throughout construction. This will be the responsibility of the successful responder for the duration of this project. The Building Enclosure Commissioning (BECx) will also be considered a part of the larger commissioning team in order to create an integrated design with a well-integrated design solution. A separate Successful Responder will serve as the Commissioning Leader (Cx Leader) as described in the B3 requirements.
Date posted: 10/10/2024
Due date: 10/21/2024

With GovernmentContracts, you can:
...Bid Title: RFP for 2027 Construction Services Category: Washington County Public Works Status... ...
Washington County
Bid Due: 11/18/2026
...Construction Administration PFP0000557 Professional Services 21 days 11/10/2026 02:00 PM CST 12/01/2026 02:00 ...
Hennepin County
Bid Due: 12/01/2026
...Bid Title: RFP for 2027 Construction Services Category: Washington County Public Works Status... ...
Washington County
Bid Due: 11/20/2026
...SP 6217-50 Robert Street Construction Contract Administration and Inspection Brief Description...: The Contractor ...
State Government of Minnesota
Bid Due: 12/01/2026