| Location: | Massachusetts |
|---|---|
| Posted: | Jun 3, 2026 |
| Due: | Jun 11, 2026 |
| Agency: | Wright-Pierce |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The project consists of full demolition of the superstructure and the substructure on the upstream side. The downstream side will consist of a partial substructure removal and replacement with a concrete bridge seat and concrete repairs to the abutment backface. These rehabilitated abutments will support precast concrete beams and cast-in-place closure beams on either end for a total length of 22’-0”. The upstream side will be replaced with a 42’-1” long precast concrete rigid frame structure containing an angle point to match the existing stream alignment. The training walls on the upstream side will be replaced using the existing stones to construct mortar rubble masonry walls supported on cast-in-place concrete footings. Additionally, the retaining wall underneath the building on the downstream side will be rehabilitated in a similar fashion to the abutment to remain. The out-to-out width of the proposed replacement structure will be 68’-10”, with a roadway width of 48’-9”.

With GovernmentContracts, you can:
Header Information Bid Number: BD-25-1799-THA02-THA02-129628 Description: Legal Services Bid Opening Date: 06/22/2026 02:00:00
Commonwealth of Massachusetts
Bid Due: 6/22/2026
RFQ - OPM for Washington Street Elementary School Renovations In accordance with Chapter
Town of Franklin MA
Bid Due: 7/09/2026
WIRELESS TELEPHONE COMMUNICATIONS FACILITY FOLLY HILL WATER TOWER Bid No. 26-014 The City
City of Beverly
Bid Due: 6/22/2026
Header Information Bid Number: BD-26-1060-ITD00-ITD00-129798 Description: RFQ 27-05145 for Salesforce LLC Solutions Bid
Commonwealth of Massachusetts
Bid Due: 6/26/2026