| Location: | Massachusetts |
|---|---|
| Posted: | Jun 3, 2026 |
| Due: | Jun 11, 2026 |
| Agency: | Wright-Pierce |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The project consists of full demolition of the superstructure and the substructure on the upstream side. The downstream side will consist of a partial substructure removal and replacement with a concrete bridge seat and concrete repairs to the abutment backface. These rehabilitated abutments will support precast concrete beams and cast-in-place closure beams on either end for a total length of 22’-0”. The upstream side will be replaced with a 42’-1” long precast concrete rigid frame structure containing an angle point to match the existing stream alignment. The training walls on the upstream side will be replaced using the existing stones to construct mortar rubble masonry walls supported on cast-in-place concrete footings. Additionally, the retaining wall underneath the building on the downstream side will be rehabilitated in a similar fashion to the abutment to remain. The out-to-out width of the proposed replacement structure will be 68’-10”, with a roadway width of 48’-9”.

With GovernmentContracts, you can:
...Bid Number: 185/020/27 Bid Title: Purchase of Various Air Filters Category: Bid and ...
Town of Andover
Bid Due: 10/01/2026
...Header Information Bid Number: BD-23-1172-PUR00-PUR01-133174 Description: Software - Web Filter... Pre Bid Conference: ...
Commonwealth of Massachusetts
Bid Due: 10/07/2026
...a confirmation email that you will need to click on to activate your ...
Wright-Pierce
Bid Due: 10/07/2026
...includes all systems and all associated components, including thermostats, filters, safety controls...
City of Fitchburg
Bid Due: 9/29/2026