Sewerage System Improvements, Little River Water Pollution Control Plant

Location: Georgia
Posted: Sep 11, 2026
Due: Sep 17, 2026
Agency: G. Ben Turnipseed Engineers
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
  • Z - Maintenance, Repair or Alteration of Real Property
Publication URL: To access bid details, please log in.
City of Social Circle, Georgia Sewerage System Improvements, Little River Water Pollution Control Plant

Bid Date: Thursday, September 17, 2026

Bid Time: 2:30 p.m.

Contact: Alicia Addenbrook, (706) 863-8800

Addendum: Addendum No. One has been issued.

Plan Holders List

Advertisement for Bid

Contract 1: Sewerage System Improvements installing approximately 3,600 linear feet of DIP and PVC sewer including manholes, jack and bore, rock excavation, clearing, soil erosion and sediment control, and appurtenances. Contract 2: Little River Water Pollution Control Plant to include a screen and grit structure, (2) two aeration basins, two (2) final clarifiers, tertiary filters, ultraviolet disinfection unit, sludge pump station, plant pump station, chemical feed facilities, control building, digester and sludge dewatering building, all complete with appurtenances.

Purchase Plans & Specs

Attachment Preview

SECTION 00020
REQUEST FOR PROPOSAL
FOR
SEWERAGE SYSTEM IMPROVEMENTS
LITTLE RIVER WATER POLLUTION CONTROL PLANT
FOR THE
CITY OF SOCIAL CIRCLE, GEORGIA
Proposals: for the Sewerage System Improvements Little River Water Pollution Control Plant will be received at
the City Manager's Office of Social Circle City Hall located at 166 North Cherokee Road, Social Circle, Georgia
30025, until 2:30 P.M. Thursday, September 17, 2026.
Proposals will be reviewed by the City and will be awarded to the proposal most advantageous to the City. A
copy of the proposal tabulation will be provided upon request.
Work to Be Done: The work to be performed by the General Contractor consists of but is not limited to the
following major items:
Contract 1: Sewerage System Improvements installing approximately 3,600 linear feet of DIP and PVC sewer
including manholes, jack and bore, rock excavation, clearing, soil erosion and sediment control, and
appurtenances. Time allotted for construction 270 consecutive calendar days.
Contract 2: Little River Water Pollution Control Plant to include a screen and grit structure, (2) two aeration
basins, two (2) final clarifiers, tertiary filters, ultraviolet disinfection unit, sludge pump station, plant pump
station, chemical feed facilities, control building, digester and sludge dewatering building, all complete with
appurtenances. Time allotted for construction is 480 consecutive calendar days and 540 days for final
completion.
Specifications and Contract Documents: Copies of the plans and specifications may be obtained from the City
of Social Circle's website or from Turnipseed Engineers website at https://turnipseed.com/current-projects/out-for-bid.
The street address, phone number, and email address of contractors submitting proposals must be provided to
ensure prompt delivery of any addenda.
All Bidders must have a State of Georgia Utility Contractor License and must employ a state "Utility Manager"
certificate holder who will have oversight of all the work.
All proposals shall be accompanied by a Bid Bond drawn in favor of Social Circle, Georgia, in the amount of at least
5% of the lump sum bid for the complete work; such Bid Bond representing that the Bidder, if awarded the contract,
will promptly enter into a contract and furnish Performance Bond and Payment Bond as provided by law and
approved by the Attorney for Social Circle, Georgia. Each bond shall be equal to 100% of the contract amount. The
Bid Bond shall be forfeited to Social Circle, Georgia as liquidated damages if the Bidder fails to execute the contract
and provide Performance and Payment Bonds within ten (10) days after being notified that he has been awarded the
contract.
The Owner reserves the right to reject any or all proposals, to waive informalities, and to re-advertise.
City of Social Circle
By:
Robbie Groves
00020-1

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...26-173 Chafee Lift Station Pumps Available Date: 9/9/2026 Due Date: 10/15/2026 no later ...

https://www.augustaga.gov/

Bid Due: 10/15/2026

...26-173 Chafee Lift Station Pumps Augusta, City Of Sep 10, 2026 @ 07:59 ...

State Government of Georgia

Bid Due: 10/15/2026

...Project: REMOVAL & INSTALLATION OF (2) 750 GPM VERTICAL TURBINE PUMPS MORGAN DAIRY ...

Floyd County

Bid Due: 9/21/2026

...Project: REMOVAL & INSTALLATION OF (2) 500 GPM VERTICAL TURBINE PUMPS BURNETT FERRY ...

Floyd County

Bid Due: 9/21/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.