Header Information
Bid Number:
BD-25-1502-FHA00-01-130096
Description:
Jordan Hughes
Bid Opening Date:
06/22/2026 02:00:00 PM
Purchaser:
Jordan Hughes
Organization:
Fitchburg Housing Authority
Department:
FHA001 - Executive Office
Location:
01 - Executive Office
Fiscal Year:
25
Type Code:
SS
Allow Electronic Quote:
Yes

Alternate Id:

Required Date:
Available Date
:
06/02/2026 08:29:54 AM
Info Contact: Bid Type:
OPEN
Informal Bid Flag:

No
Purchase Method:
Open Market
Pre Bid Conference:
Bulletin Desc:
The FITCHBURG HOUSING AUTHORITY, the Awarding Authority, invites sealed bids
from Contractors for the Emergency Structural Repairs 2 at State Aided Development:
Canton Valley (705-2, previously 667-1) in Fitchburg, Massachusetts, in accordance
with the documents prepared by PARE CORPORATION.
Ship-to Address:
Cameron Davis
50 Day Street, Ste#1
Fitchburg, MA 01420
US
Email: cdavis@fitchburgha.org
Phone: (978) 540-4039
Bill-to Address:
Accounts Payable
Fitchburg Housing Authority
50 Day Street, Ste#1
Fitchburg, MA 01420
US
Email: AP@fitchburgha.org
Phone: (774) 519-5573
Print Format:
Bid Print
Required Quote Attachments
Desired Attachment Name Description
Item Information

Item # 1:


The Project consists of but not limited to:
This project applies to all eight buildings within the development. 23 units are included in
the base scope. Within the units identified, the finish floor is to be replaced. In the
process of replacing the finish floor, the underlayment will be removed as needed to
receive the new flooring and expose any underlying structural deficiencies. The primary
cause of these deficiencies have been identified as water and termite damage in certain
units. Where damage is most severe, this includes replacement of the subfloor planking
and sistering of the joists which have been compromised. The objective is to achieve the
required flatness and an improved level condition for each floor. Where this cannot be
achieved by replacement of the underlayment alone, cementitious self-leveling
underlayment will be required. Scope includes limited wall finishing where framing was
exposed during the structural investigation. Some timber beams accessible through the
crawlspaces have been identified to receive epoxy repair for checking. Wood blocking
under an interior door jamb is included to mitigate defects in the original construction.
Scope includes abatement of any 9"x9" asphalt tiles containing asbestos.
Qty Unit Cost UOM Total Discount Amt. Total Cost

This item is narrative



Item # 2:

(

72-13

-
00

)



The Project consists of but not limited to:
This project applies to all eight buildings within the development. 23 units are included in
the base scope. Within the units identified, the finish floor is to be replaced. In the
process of replacing the finish floor, the underlayment will be removed as needed to
receive the new flooring and expose any underlying structural deficiencies. The primary
cause of these deficiencies have been identified as water and termite damage in certain
units. Where damage is most severe, this includes replacement of the subfloor planking
and sistering of the joists which have been compromised. The objective is to achieve the
required flatness and an improved level condition for each floor. Where this cannot be
achieved by replacement of the underlayment alone, cementitious self-leveling
underlayment will be required. Scope includes limited wall finishing where framing was
exposed during the structural investigation. Some timber beams accessible through the
crawlspaces have been identified to receive epoxy repair for checking. Wood blocking
under an interior door jamb is included to mitigate defects in the original construction.
Scope includes abatement of any 9"x9" asphalt tiles containing asbestos.

U N S P S C Code:
72-13-00
General building construction

Qty Unit Cost UOM Total Discount Amt. Total Cost

1.0




EA - Each








Manufacturer:

Brand:

Model:

Make:

Packaging:


Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...doors in Loading Dock M005 on Level 0. Provide soffit wall and metal ...

Massachusetts Convention Center Authority

Bid Due: 7/22/2026

...doors in Loading Dock M005 on Level 0. Provide soffit wall and metal ...

Massachusetts Convention Center Authority

Bid Due: 7/22/2026

...doors in Loading Dock M005 on Level 0. Provide soffit wall and metal ...

Massachusetts Convention Center Authority

Bid Due: 7/22/2026

...will consist of a concrete foundation, reinforced floor slabs, steel framing and masonry ...

DEPT OF DEFENSE

Bid Due: 7/23/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.