PROJECT MANUAL
2026 Generator Replacement Sewer Pump Station #3
FOR THE TOWN OF TYRONE
Project Number: PW-2026-05
Prepared By: Town of Tyrone
October 5, 2026
Information for Bidders
Return completed bid form, and certificate of insurance as required in the Bid Documents to:
Town of Tyrone
Attn: Katie Swann, E.I.
950 Senoia Road
Tyrone, GA 30290
Complete bid package must be received no later than the date and time listed on the
ADVERTISMENT FOR BIDS, or as changed by an ADDENDUM. It is the responsibility of the
bidder to ensure the owner's receipt of the completed bid package. The project consists of
removing the existing generator and the legal disposal of the existing generator, along with the
installation of a new Cummins C125N6 generator set at Pump Station #3, located behind 475 Park
Haven Lane, Tyrone, Ga 30290. Contractor will perform a factory authorized start-up. The
contractor will inspect the installation and provide written approval of the start-up. The contractor
will simulate a power outage and demonstrate that the generator will automatically start and begin
supplying power without any hands-on involvement. When normal power is restored, the
generator will shut itself off and return to standby status. The contractor will be responsible for the
bypass of sewer from pump station to the force main when power will be shut off to the pump
station.
By submitting and signing the bid form, the contractor acknowledges that they are familiar with
the site and existing conditions as ascertained through a site visit. No adjustments will be made
to the contract price due to existing site conditions not shown in the specifications or plans which
could have been discovered by a site visit by the contractor. Site visits will be allowed between
8:30 AM to 4:00 PM, Monday through Friday. It is required to schedule an appointment for
access. Appointments require 24 hours' notice (one business day) and can be scheduled by
contacting Katie Swann, E.I., Engineering Specialist at 770-487-4038.
ALL BIDS must be made on the required BID form. All blank spaces for BID prices must be filled
in, in ink or typewritten, and the BID form must be fully completed when submitted. Only one copy
of the BID form is required. In case of discrepancy between unit prices and extended prices, unit
prices shall prevail. The Engineer will correct any such errors and/or any errors in the summation
of the extended prices. The Total Base Bid Amount shall be the sum of the Lump Sum prices, the
corrected extended prices, and any pre-printed required allowances.
The OWNER may waive any informalities or minor defects or reject any and all BIDS. Any BID
may be withdrawn prior to the above scheduled time for the opening of BIDS or authorized
postponement thereof. Any BID received after the time and date specified shall not be considered.
No BIDDER may withdraw a BID within sixty (60) days after the actual date of the opening thereof.
Should there be reasons why the Contract cannot be awarded within the specified period, the time
may be extended by mutual written agreement between the OWNER and the BIDDER.
BIDDERS must satisfy themselves of the accuracy of the estimated quantities in the BID Schedule
iii
by examination of the site and a review of the drawings and specifications including ADDENDA.
After BIDS have been submitted, the BIDDER shall not assert that there was a misunderstanding
concerning the quantities of WORK or of the nature of the WORK to be done.
The OWNER shall provide to BIDDERS, prior to BIDDING, all information which is pertinent to,
and delineates and describes, the land owned and rights-of-way acquired or to be acquired. All work
shall be performed within the land owned and/or rights-of-way of the Town of Tyrone.
The CONTRACT DOCUMENTS contain the provisions required for the construction of the
PROJECT. Information obtained from an officer, agent, or employee of the OWNER or any person
shall not affect the risks or obligations assumed by the CONTRACTOR or relieve the Contractor
from fulfilling any of the conditions of the Contract.
The NOTICE TO PROCEED shall be issued within ten (10) days of the execution of the Agreement
by the OWNER. Should there be reasons why the NOTICE TO PROCEED cannot be issued within
such period, the time may be extended by mutual written agreement between the OWNER AND
CONTRACTOR. If the NOTICE TO PROCEED has not been issued within the ten (10) day period
or within the period mutually agreed upon, the CONTRACTOR may terminate the Agreement
without further liability on the part of either party.
The OWNER may make such investigations as deemed necessary to determine the ability of the
BIDDER to perform the WORK, and the BIDDER shall furnish to the OWNER all such information
and data for this purpose as the OWNER may request. The General Contractor shall have a minimum
of five (5) years of experience with projects of similar type and scope of work. The OWNER reserves
the right to reject any BID if the evidence submitted by, or investigation of such, BIDDER fails to
satisfy the OWNER that such BIDDER is properly qualified to carry out the obligations of the
Agreement and to complete the WORK contemplated therein.
Award of the Contract will be made to the lowest responsive and responsible BIDDER on the basis
of the lowest actual bid amount for the Contract, which is defined as the base bid less any deductions
for "allowed" deductive alternates, plus any additions for "allowed" additive alternates listed in the
Bid Schedule. The Owner reserves the right to delete or modify portions of the work in order to meet
constraints caused by budget limitations.
iv
| No. | Item | Estimate Quantity | Unit | Unit Price | Total Price |
|---|---|---|---|---|---|
| 1. | Remove, dispose of existing generator, and replace with new Cummins C125N6 generator set, complete. | 1 | Lump Sum | $ | $ |
| 2. | Allowance for Special Contingency | 1 | Lump Sum | $ 5,000.00 | $ 5,000.00 |
| No. | Item | Unit Price |
|---|---|---|
| 1. | N/A | $ |
2026 Generator Replacement Sewer Pump Station #3
PW-2026-05
BID FORM
Bidder declares that the full name and business address of Bidder's Principal is as follows:
FEIN# (required)
Company
Address
City/State/ZIP CODE
Phone Email
ACKNOWLEDGE ALL AGENDA (by number and date):
Addendum
Signature acknowledges that Bidder has read the bid documents thoroughly before submitting a bid, will fulfill the
obligations in accordance to the scope of work specifications, terms, and conditions, and is submitting without
collusion with any other individual or firm. Authorized signature is required. Bidder certifies they are a Drug-Free
Workplace. Bidder agrees to complete the work in thirty (30) calendar days after receiving the generator from the
manufacturer.
BASE BID:
BIDDER agrees to perform all the work described in the CONTRACT DOCUMENTS for the following lump sum including
all applicable taxes and fees:
BASE BID SCHEDULE
Estimate Unit Total
No. Item Quantity Unit Price Price
1. Remove, dispose of existing 1 Lump $ $
generator, and replace with new Sum
Cummins C125N6 generator set,
complete.
2. Allowance for Special 1 Lump $ 5,000.00 $ 5,000.00
Contingency Sum
Total of Base Bid (including allowance) - $
UNIT PRICE: BIDDER agrees to perform all the work described in the CONTRACT DOCUMENTS for the following unit
price including all applicable taxes and fees:
Unit
No. Item Price
1. N/A $
BF-1
2026 Generator Replacement Sewer Pump Station #3
PW-2026-05
BID FORM
Bidder has examined the premises and conditions affecting the Work, the undersigned proposes to furnish all
services, labor and materials called for by them for the entire Work, in accordance with said documents,
for the Base Bid price of: DOLLARS (in words)
$ (in Numbers) which amount is hereinafter called the "Base Bid."
Signed, sealed, and dated this day of , 2026
Legal Name of Company: Company Seal
Authorized Signature:
Printed Name:
Title:
(THE TOWN OF TYRONE RESERVES THE RIGHT TO ADD/MODIFY/DELETE WORK IN THIS CONTRACT)
Project Manager: Katie Swann, E.I.
Engineering Specialist
katie.swann @tyronega.gov
770-487-4038
BF-2
AGREEMENT
THIS AGREEMENT made this day of , 20 , by and between the Town of
Tyrone, Georgia, hereinafter called "Town" and ______________________, hereinafter called "Contractor".
WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned:
Section 1. Scope of Work
The Work to be performed by the Contractor shall consist of removing the existing generator and the
legal disposal of the existing generator, along with the installation of a new Cummins C125N6 generator set at
Pump Station #3, behind 475 Park Haven Lane, Tyrone, GA 30290. Contractor will perform a factory authorized
start-up. The contractor will inspect the installation and provide written approval of the start-up. The contractor
will simulate a power outage and demonstrate that the generator will automatically start and begin supplying
power without any hands-on involvement. When normal power is restored, the generator will shut itself off and
return to standby status. Installation shall be in accordance with the project documents dated October 5, 2026.
The Contractor will furnish all of the materials, supplies, tools, equipment, labor, and other services necessary
for the Work described herein.
Section 2. Term
The Contractor will perform the Work described herein within the timeframe as stated in the
project documents' Bid Form.
1
Section 3. Payment
The Owner shall pay to the Contractor compensation upon completion by the Contractor of the Work
described herein. Payment terms are NET THIRTY (30) days following receipt of a correct invoice. Invoices must
be submitted to:
Town of Tyrone
Attn: Scott Langford, PE
950 Senoia Road
Tyrone, GA 30290
Section 4. Insurance
The Firm's Comprehensive General and Automobile Liability Insurance shall be written for not less
than limits of liability as follows:
A. Comprehensive General Liability
a. Bodily and Personal Injury, Property Damage and Contractual: $1,000,000 Combined
Single Limit Each Occurrence/$2,000,000 General Aggregate
b. General Aggregate Limits shall apply per Project
B. Comprehensive Automobile Liability
a. Bodily Injury and Property Damage: $1,000,000 Combined Single Limit Each
Occurrence
b. Any Auto including Hired and Non-Owned liability coverage is required.
C. Workers' Compensation
a. Workers' Compensation insurance covering all employees of Contractor or any
subcontractor engaged in performing the services required by this proposal of not less than the
minimum requirement of $100,000 per accident/$100,000 Disease each employee/$500,000
Disease policy limit. At a minimum, the policy must also meet Georgia required coverage.
2
D. The Town must be listed as "additional insured" on the policy of insurance as follows: Town of
Tyrone; 950 Senoia Road; Tyrone, GA 30290.
Firm shall provide the Town with a valid Certification of Insurance evidencing the Town as an
addition. The certificate shall be on the ACORD 25 form. The certificate will further confirm that at least thirty
(30) days prior written notice will be furnished to the Town by Insurer before cancellation or non-renewal of
policy. The insurance policies may not include a deductible, retention or self-insurance in excess of $10,000.
It is further understood that any coverage extended by reason of this paragraph shall be primary and non-
contributory and such shall be evidenced on the Certificate of Insurance. Any insurance maintained by the
Town of its own protection shall be secondary of excess insurance. All insurance companies providing coverage
must have an AM Best Rating of A-VII or better unless approved by the Town in advance at its sole discretion.
Providing and maintaining adequate insurance coverages is a material obligation of the Contractor and
is of the essence of this contract. All such insurance shall meet all laws of the State of Georgia. Such insurance
coverage shall be obtained from companies that are authorized to provide such coverage and that are authorized
to do business in Georgia. The Contractor shall, at all times, comply with the terms of such insurance policies,
and all requirement of the insurer under any such insurance policies, except as they may conflict with existing
Georgia laws or this contract. The limits of coverage under each insurance policy maintained by the Contractor
shall not be interpreted as limiting the Contractor's liability and obligations under the contract. Upon award of
this contract, the selected Contractor shall add the Town of Tyrone as a certificate holder to their insurance
policy and the Town shall be listed as additional insured.
3

With GovernmentContracts, you can:
...SEWER GRINDER SYSTEM Bryan County Board Of Commissioners Oct 29, 2026 @ 10:24 ...
State Government of Georgia
Bid Due: 12/02/2026
...Glenwood FY27 CDBG Sewer System Improvements Glenwood, City Of Nov 02, 2026 @ ...
State Government of Georgia
Bid Due: 12/07/2026
...INVITATION TO BID SEWER GRINDER SYSTEM Start Date: 10/29/2026 Close Date: 12/02/2026 2:00 ...
County of Bryan
Bid Due: 12/02/2026
...Professional Emergency Repair Services for On-Call Water, Sanitary Sewer, and Stormwater Canton...-Call Water, ...
State Government of Georgia
Bid Due: 12/11/2026