SCOPE OF WORK
CUYAHOGA #29F PROJECT
Multiple Orphan Well Sites
Cuyahoga County, Various Townships
PROJECT DESCRIPTION
The Cuyahoga #29F project shall include the following wells:
Wells to be plugged per the individual plugging plan.
Well Name
API Number
County
Township
Latitude Longitude
Eames David #1
Desmond Gerald #1
Warren #1
34-035-6-0724-00-00
34-035-6-0860-00-00
34-035-6-1278-00-00
Cuyahoga
Cuyahoga
Cuyahoga
City of Cleveland
City of Lakewood
City of Cleveland
41.461188
41.471191
41.462047
-81.805766
-81.806444
-81.803414
PROJECT SCOPE OF WORK:
This project includes mobilization, access and well site development, drilling or cleaning out of and
plugging of three (3) Orphan Wells, storage and disposal of all materials generated during the plugging of
the well, decommissioning, removal, storage and disposal of all casing, tubing, well and production
equipment and affiliated lines and restoration of all areas disturbed during this project.
PROJECT DIRECTIONS: Coordinates listed are the proposed ingress/egress point for the well site.
Eames David #1:
Lat: 41.461373
Long: -81.805813
Desmond Gerald #1:
Lat: 41.471240
Long: -81.806519
Warren #1:
Lat: 41.486460
Long: -81.708988
SCOPE OF WORK
CUYAHOGA #29F PROJECT
Multiple Orphan Well Sites
Cuyahoga County, Various Townships
GENERAL SCOPE OF WORK
The Contractor, the Contractor’s agents, representatives, and subcontractors shall perform this Plugging
Project in accordance with Ohio Revised Code 1509, Ohio Administrative Code Chap. 1501:9-11 and
1501:9-12, the Agreement, and in accordance with the following documents that are attached hereto and
made a part hereof:
1.
Project Description;
2.
General Scope of Work;
3.
Davis-Bacon Wage Requirements;
4.
General Conditions;
5.
General Specifications;
6.
Sequence of Work;
7.
Well Description;
8.
Plugging Plans;
9.
Detailed Specifications;
10.
Quantity Sheet
11.
Drawing Plan Set
12.
Appendix I – Ohio One-Call;
13.
Appendix II – Well Records;
14.
Appendix III – Permit and Permit Conditions;
15.
Appendix IV – Wage Determination;
Subject to the Contractor’s compliance with this Scope of Work, Contractor is solely responsible for and
has control over all plugging and reclamation construction means, methods, manners, techniques,
sequences, and procedures, for safety precautions and programs in connection with the Plugging Project,
and for coordinating all portions of the Plugging Project.
SCOPE OF WORK
CUYAHOGA #29F PROJECT
Multiple Orphan Well Sites
Cuyahoga County, Various Townships
DAVIS-BACON WAGE REQUIREMENTS
PART 1: PAYMENT OF PREVAILING WAGES
1.1 The Subcontractor shall pay the prevailing wage rates of the Project locality, as determined by the
U.S. Secretary of Labor, to laborers and mechanics performing Work on the Project.
1.2 The Subcontractor shall comply with the provisions, duties, obligations, and is subject to the
remedies and penalties of 40 U.S.C. parts 3141-3144, 3146 3147; 42 U.S.C. part 3212 The Davis-
Bacon Act; and 40 U.S.C. parts 3701-3708 The Contract Work Hours and Safety Standards Act.
1.3 The Subcontractor shall submit all payroll reports in compliance with the requirements of Section
1.2 for all employees.
1.4 By executing a Contract, the Subcontractor certifies that it based its Bid upon the prevailing rates
of wages as ascertained by the U.S. Secretary of Labor.
1.5 The Subcontractor may access the U.S. Secretary of Labor at its website,
https://sam.gov/content/wage-determinations, to obtain the current wage rates. A copy of the
current wage rates are included herein.
PART 2: PAYROLL SCHEDULE
2.1 Within 10 days of the date of the Notice to Proceed, the Subcontractor shall provide the Contracting
Authority’s Prevailing Wage Coordinator a schedule of dates during the term of the Contract on
which wages shall be paid to employees for the Project.
PART 3: PAYROLL REPORTS
1.3.1 The Subcontractor shall submit payroll reports with each Payment Request, which reports shall be
certified by the Subcontractor that the payroll is correct and complete, and that the wage rates
shown are not less than those required by the Contract.
1.3.1.1 Each payroll report shall indicate the period covered and include a list containing the name,
address, and last four digits of the social security number of each employee of the
Subcontractor paid for the Work.
1.3.1.2 Each payroll report shall list the number of hours each employee worked each day on the
Project during the reporting period, the total hours each day on the Project per job
classification, the total hours each week on the Project, the employee's hourly rate of pay,
job classification, hourly rate of fringe benefits, all deductions from wages and net pay
(actual wages paid).
1.3.1.3 Each payroll report shall list each fringe benefit and state if it is paid as cash to the
employee or to a named plan.
1.3.1.4 The Subcontractor shall submit apprenticeship agreements for all apprentices utilized on
the Project.
1.3.2 The Subcontractor shall maintain payrolls and basic payroll records during the course of the work
and shall preserve them for a period of three years from the completion of the Contract for all
laborers and mechanics, including guards and watchmen, working on the Contract.
1.3.3
The records to be maintained under this paragraph shall be made available by the Subcontractor for
inspection, copying, or transcription by authorized representatives of the Contracting Authority and
the U.S. Department of Labor, and the Contractor or Subcontractor will permit such representatives
to interview employees during working hours on the job.
SCOPE OF WORK
CUYAHOGA #29F PROJECT
Multiple Orphan Well Sites
Cuyahoga County, Various Townships
GENERAL CONDITIONS
PART 1: OHIO DEPARTMENT OF TRANSPORTATION SPECIFICATIONS
This Cuyahoga #29F Project (Project) references the Ohio Department of Transportation
(ODOT) Construction and Material Specifications (ODOT CMS). Any reference to these
specifications is to ODOT’s most current version of the specifications. The ODOT CMS can be found at
https://www.dot.state.oh.us/Divisions/ConstructionMgt/OnlineDocs/Pages/2023-Online-Spec-Book.aspx
PART 2: PRE-SITE MEETING
The Contractor or Contractor's representative must attend the pre-site meeting. Failure to attend the pre-site
meeting is grounds for the Division to reject the Contractor’s Offer.
The Ohio Department of Natural Resources, Division of Oil & Gas Resources Management (Division)
intends to begin the pre-site meeting on time. At the meeting, the Division will circulate and collect
attendance sign-in forms to all contractors present. Only those contractors in attendance throughout the pre-
site meeting, including the discussion of the Scope of Work, will be considered present for the pre-site
meeting.
PART 3: MODIFICATIONS TO THE SCOPE OF WORK PRIOR TO AWARD
The Scope of Work may only be altered by written modification. The Division may issue an Amendment
to the Scope of Work and will provide a notification of the Amendment by email to all Department of
Administrative Services (DAS) pre-qualified contractors. Each contractor is responsible for logging into
OhioBuys and submitting an offer that is responsive to all Amendments issued. All offers submitted prior
to an amendment being issued shall become null/void and not consider in the opening. All Amendments
shall become part of the Scope of Work.
Any interpretation or clarification of the Scope of Work made by any person other than the Division, or in
any manner other than a written Amendment, is not binding and the Contractor cannot rely upon any such
interpretation or clarification.
The Contractor cannot, at any time after the award of the Scope of Work be compensated for any issue with
the Scope of Work, including alleging insufficient data, incomplete, ambiguous, conflicting, or erroneous
language, or incorrectly assumed conditions regarding the nature or character of the work.
PART 4: PERMIT AND INSPECTION REQUIREMENTS
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.