| Location: | Washington |
|---|---|
| Posted: | Oct 21, 2025 |
| Due: | Nov 24, 2025 |
| Agency: | State Government of Washington |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | Ref #: SWR2509 |
| Publication URL: | To access bid details, please log in. |
| Solicitation Close Date: | 11/24/25 |
| Title: |
WSDOT SWR HQ HVAC controls upgrade
Ref #:SWR2509 |
| Contact: | Brian Altig |
| Amendment Date: |
|
| Description: | install Direct Digital Controls in accordance with attached specifications. To maintain continuity of operations, the new Distech DDC system must be constructed prior to decommissioning the existing controls system. All equipment must remain fully operational until it is scheduled for decommissioning. Once each piece of equipment is taken offline, equipment must be integrated into the new Distech system. New Distech control panels must be built and programmed in advance of cutovers. |
| : | |
| : | Pre-Bid Conference: 10/29/25 10:00 |
| : | |
| : | Deadline for Submitting Questions: 10/28/25 |
| : | |
| : | Includes an Inclusion Plan: N |
| : | |
| : | Additional Data |

With GovernmentContracts, you can:
...glazing and panel systems at the Three Rivers Transit facility in Kennewick, Washington. ...
Ben Franklin Transit (BFT)
Bid Due: 6/16/2026
...chemical pump system includes control and alarm panels with Owner furnished equipment for ...
Pierce County
Bid Due: 6/10/2026
...(RFP) to repair by replacement the existing roof of Building 3087 with a ...
DEPT OF DEFENSE
Bid Due: 6/14/2026
...(via Automated Load Management or equivalent system). c. Equipment must support networking via ...
Sammamish Plateau Water
Bid Due: 7/02/2026