DEVA 335272 - TITUS CANYON ROAD CONSTRUCTION

Location: Federal
Posted: Nov 7, 2024
Due: Nov 22, 2024
Agency: INTERIOR, DEPARTMENT OF THE
Type of Government: Federal
Category:
  • Y - Construction of Structures and Facilities
Solicitation No: 140P2025R0024
Publication URL: To access bid details, please log in.
Follow
Y--DEVA 335272 - TITUS CANYON ROAD CONSTRUCTION
Active
Contract Opportunity
Notice ID
140P2025R0024
Related Notice
Department/Ind. Agency
INTERIOR, DEPARTMENT OF THE
Sub-tier
NATIONAL PARK SERVICE
Office
DSC CONTRACTING SERVICES DIVISION
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information
  • Contract Opportunity Type: Sources Sought (Original)
  • Original Published Date: Nov 07, 2024 08:33 am MST
  • Original Response Date: Nov 22, 2024 11:00 am MST
  • Inactive Policy: 15 days after response date
  • Original Inactive Date: Dec 07, 2024
  • Initiative:
    • None
Classification
  • Original Set Aside:
  • Product Service Code: Y1LB - CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
  • NAICS Code:
    • 237310 - Highway, Street, and Bridge Construction
  • Place of Performance:
Description
The project is located at Death Valley National Park, California and Nevada. The surrounding area is rural with limited staging located at various turnouts along the project roadway. The roadway is closed to the public due to storm damage. Delivery of materials is anticipated to be complicated by rough roadway conditions. The construction site is 85 miles from nearest suppliers, and 10 miles from the nearest lodging facilities. Park roads leading to the start of the project will remain open during construction, thus contract activities and logistics must be structured and scheduled to minimize visitor impact. The site requires protective measures to ensure the surrounding area remains undisturbed. The roadway is a historic cultural resource. The anticipated period of performance of 200 calendar days including any potential weather shutdown. There are seasonal/other shutdowns mandated through the construction season due to high temperatures in summer. Winter construction may be required.
Project Scope:
Titus Canyon is the most popular back-country road in Death Valley National Park. This project will make repairs to the eastern 13.5 miles of Titus Canyon Road between the east boundary gate and the head of the canyon just west of the Leadfield town site. The 97-year-old, 24.7-mile route, of which the easternmost 22 miles were classified as a route suitable only for high clearance/4x4 vehicles, was heavily damaged in both the August 2022 and 2023 storm events. Due to the severe damage, the road currently is impassable for all vehicles larger than a bicycle at multiple locations. Those two storm events produced rainfall that far exceeded previous historic storm events.

The most common form of damage was erosional gully cutting from storm runoff running down long lengths of the roadway due to the extremely high flows and inadequate numbers of runoff diversion structures, or diversions that were no longer maintained and thus allowed runoff to concentrate on the roadway. There also were multiple road crossings of wash channels where the high flood flows jumped the wash channels and ran down and cut gullies in long lengths of the roadway. Additionally, the heavy rains destabilized many of the steep slopes above the roadway and generated significant rockfall onto the roadway. On multiple steep sidehill roadway segments, especially in the vicinity of Red Pass, the poorly compacted outboard edge of the roadway was also destabilized by the heavy rains and runoff. In several of these areas the remaining roadway width has been reduced to an unsafe dimension (even for 4x4 vehicles) of 10-feet or less. On the westernmost 8-miles of the road between Leadfield and the canyon mouth where the road was located on the floor of Titus Canyon, the road was totally obliterated by the flood flows and deep deposition of alluvial sand, gravel, and boulders.


Attachments/Links
Contact Information
Contracting Office Address
  • 1 Denver Federal Center, Building 50 P.O. Box 25287
  • Denver , CO 80225
  • USA
Primary Point of Contact
Secondary Point of Contact


History
  • Nov 07, 2024 08:33 am MSTSources Sought (Original)
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Follow TECHNOLOGY TRANSFER LICENSING OPPORTUNITY: Cladding and Freeform Deposition for Coolant...

NATIONAL AERONAUTICS AND SPACE ADMINISTRATION

Bid Due: 3/02/2027

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.