| Location: | Wyoming |
|---|---|
| Posted: | Dec 11, 2025 |
| Due: | Jan 13, 2026 |
| Agency: | City of Cheyenne |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: Parsley Boulevard Greenway Connectors
Addenda: 0
Release Date: 12/11/2025
Due Date: 1/13/2026
Parsley Boulevard Greenway project includes installation of 640 lf of new 10-foot wide concrete sidewalk, removal of curb, gutter and sidewalk, installation of curb and gutter with asphalt patch, replacement of asphalt drive approach and installation of crushed base at alley, installation of drainage appurtenances and relocation of signage and Greenway fence. Contractor shall NOT do any work or store any material within the Interior Heights Addition Blocks 32 & 33 as described on the plans. Project will be within the public right of way in accordance with City of Cheyenne Construction Standards.

With GovernmentContracts, you can:
...- EARTH MOVING AND EXCAVATING EQUIPMENT NAICS Code: 333120 - Construction Machinery Manufacturing ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 6/12/2026
...) for Construction of the Ground Based Strategic Deterrent (GBSD) Utility Corridor (UC) ...
DEPT OF DEFENSE
Bid Due: 6/17/2026
...) for Construction of the Ground Based Strategic Deterrent (GBSD) Utility Corridor (UC) ...
DEPT OF DEFENSE
Bid Due: 6/17/2026
...) for Construction of the Ground Based Strategic Deterrent (GBSD) Utility Corridor (UC) ...
DEPT OF DEFENSE
Bid Due: 7/08/2026