| Location: | South Carolina |
|---|---|
| Posted: | Dec 16, 2025 |
| Due: | Jan 14, 2026 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | FA480326B0001 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
“Notice to Offeror(s)/Supplier(s): Funds are not presently available for thiscontract. No award will be made under this solicitation until funds are available.The Government’s obligation under this contract is contingent upon theavailability of appropriated funds from which payment for contract purposes canbe made. No legal liability on the part of the Government for any payment mayarise until funds are made available to the Contracting Officer for this contractand until the Contractor receives notice of such availability, to be confirmed inwriting by the Contracting Officer. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs.”
This Statement of Work (SOW) is for the design, demolition, and installation of HVAC equipment at building 611. The existing chiller and chilled water pump shall remain and be used in the design.The contractor shall temporarily dissemble the existing ceiling grid around HVAC equipment so the requirements of this project can be met.The contractor shall temporarily support all ceiling mounted systems and components in the work area above the ceiling while performing this work.The contractor shall replace any damaged ceiling grid or ceiling tiles with matching grid and tile materials. Before any demolition occurs. The flow rate of both the hot water and chilled water must be measured at both air handlers. The results shall be submitted to the government.
Please see attachment 01 for details.
Solicitation Date: To be determined.
| Dec 16, 2025 | [Sources Sought (Updated)] Repair HVAC B611 |
| Jan 23, 2026 | [Solicitation (Original)] B611 HVAC Repair |
| Mar 6, 2026 | [Solicitation (Updated)] B611 HVAC Repair |
| Mar 11, 2026 | [Solicitation (Updated)] B611 HVAC Repair |

With GovernmentContracts, you can:
Ad Title: Fire Equipment-Hose Purchasing Agent/Entity: City of Lake City Ad Publish Date:
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/11/2026
Project Name: Bridge to the Wild Restaurant and Forest Habitats Agency/Owner: Riverbanks Zoo
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/23/2026
Ad Title: 2026 MILE CREEK ROAD RESURFACING PROJECT Purchasing Agent/Entity: Pickens County Ad
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/25/2026
Ad Title: Provide Exhaust Hood Cleaning and Inspection Services Purchasing Agent/Entity: Lexington School
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/11/2026