Senate Bill 64 Compliance Injection Wells

Location: Florida
Posted: Apr 10, 2025
Due: May 8, 2025
Agency: Pinellas County
Type of Government: State & Local
Category:
  • 99 - Miscellaneous
Solicitation No: 25-0551-RFQ-CCNAC
Publication URL: To access bid details, please log in.


Project ID: 25-0551-RFQ-CCNAC

Title: Senate Bill 64 Compliance Injection Wells

Addenda: 0

Release Date: 4/10/2025

Due Date: 5/8/2025

Post Information
Posted At:Thu, Apr 10, 2025 8:00 AMSealed Bid Process:Yes (Bids Sealed / Pricing Sealed)Private Bid:No
Overview
Summary

The project will provide the County with a reclaimed water disposal option via two (2) injection wells located at the McKay Creek Booster Station and Lake Seminole Park. Providing that the necessary hydrogeologic conditions are present, the project will provide the County with 2 functional injection wells with an injection capacity of up to 36 million gallons per day and one (1) monitor well at each location.

Background

The South Cross Bayou Advanced Water Reclamation Facility (SCBAWRF) provides reclaimed water to its customers in the southern portion of Pinellas County. During the rainy season and low customer demand, excess reclaimed water is disposed of into Joe’s Creek via the plant’s outfall structure. Senate Bill 64 requires the elimination of nonbeneficial surface water discharge of reclaimed water from municipal wastewater plants by January 1, 2032. The 2 injection wells will provide a reliable disposal method during high flow and wet weather events. The selected consultant will design and submit permit applications to the FDEP UIC for two Class I injection wells. Additionally, the selected consultant will be required to prepare the bid documents for the construction of the two injection wells, perform construction oversight for both wells, design, permit and perform construction oversight of the surface facilities / conveyance piping, plan and oversee the operational testing of the two wells, and prepare the applications for the final operations permits.

Timeline
Release Project Date:
April 10, 2025
Question Submission Deadline:
April 25, 2025, 3:00pm
Submission Deadline:
May 8, 2025, 3:00pm
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Master Meters installed throughout the Water, Wastewater, and IQ distribution systems. Flow meters... ...

Collier County

Bid Due: 6/12/2026

...Bid Number: 25/26-010 Bid Title: FIELD SUPPORT SERVICES FOR AGRICULTURAL WATER USE MONITORING... ...

Suwannee River Water Management District

Bid Due: 7/01/2026

...Bid Number: 25/26-010 Bid Title: FIELD SUPPORT SERVICES FOR AGRICULTURAL WATER USE MONITORING... ...

Suwannee River Water Management District

Bid Due: 7/01/2026

...improvement intended to enhance water quality, increase system reliability, and strengthen fire flow.../2026 ...

Volusia County

Bid Due: 6/25/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.