| Location: | Delaware |
|---|---|
| Posted: | Sep 14, 2026 |
| Due: | Oct 13, 2026 |
| Agency: | State Government of Delaware |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | T202280202 |
| Publication URL: | To access bid details, please log in. |
Important Specific Message
Also available to BidX subscribers
9/14/2026
10/13/2026 at 2:00 PM Local Time
|
Supporting Bid Documents |
| RFP - Public Works |
| Planholder |
| Plans |
| Breakout sheets |
| Appendix A |
STATE OF DELAWARE
DEPARTMENT OF TRANSPORTATION
BID PROPOSAL
CONTRACT T202280202
WOODLAND FERRY IMPROVEMENTS, FY22
Federal Aid No. ESTP-2021(30)
CFDA: 20.205
Advertisement Date: September 14, 2026
INCLUDED IN THIS DOCUMENT: ADDITIONAL BID PROPOSAL ITEMS:
BID PROPOSAL: ATTACHED OR POSTED DOCUMENTS:
GENERAL DESCRIPTION PROJECT PLANS
PROSPECTIVE BIDDERS NOTES QUESTIONS & ANSWERS (if posted)
BREAKOUT SHEETS
GENERAL NOTICES
BIDDERS LIST
PREVAILING WAGES
PAPER BIDDERS CONTACT DELDOT
SPECIAL PROVISIONS
FOR BID SUBMITTAL DOCUMENTS:
STATEMENTS
DRUG TESTING AFFIDAVIT
QUANTITY SHEET SUMMARY
CERTIFICATION FORM
BID BOND FORM
CD FOR BID PRICE ENTRY & PRINTING
BIDDERS LIST
This Bid Proposal and related documents can be viewed on bids.delaware.gov and bidx.com/de/
Internet Bids for Bidders with Bid Express(R) accounts can be submitted at BIDX.com/de; OR;
Paper Bids with CD will be received in the Bidder's Room at the DelDOT Administration Building, Dover, DE;
ALL BIDS DUE PRIOR TO 2:00 P.M. Local Time, OCTOBER 13, 2026
1 of 102
Contract No. T202280202
DIGITAL ACCESSIBILITY NOTICE
The Delaware Department of Transportation (DelDOT) is committed to ensuring that its digital services, content, and
documents are accessible to all users and is actively working to comply with applicable federal and state accessibility
requirements. DelDOT continues to make improvements over time, with current efforts focused on programs, applications,
content, and documents that are actively in use and available to the public.
Due to the nature and complexity of certain materials, including construction plans, technical drawings, historical
documents, maps, and other graphic-intensive files, some documents may not currently be fully digitally accessible or
compliant with current accessibility standards. In some cases, these documents are provided for historical, reference,
informational, or procurement purposes only.
If you require an accessible version of a document or need assistance accessing any content, please contact DelDOT
at (302) 760-2031 or DOT.ask@delaware.gov, and reasonable efforts will be made to provide the information in an
accessible format upon request. DelDOT appreciates your patience and understanding as accessibility improvements
continue to be implemented.
2 of 102
Contract No. T202280202
Woodland Ferry Improvements, FY22 Federal Aid Project No. ESTP-2021(30)
GENERAL DESCRIPTION
A. BIDS DUE: OCTOBER 13, 2026 PRIOR TO 2:00 P.M. Local Time - unless changed via Addendum.
BIDS MUST BE SUBMITTED VIA:
(a) Internet - Bidders with DelDOT Bid Express(R) accounts can submit bids at bidx.com/de/.
OR:
(b) Paper Bid Delivered To: Delaware Department of Transportation (DelDOT), Administration Building
North Entrance, Bidders Room, 800 Bay Road, Dover, DE 19901
For paper bids, contact DelDOT at dot-ask@delaware.gov or (302) 760-2031 to request a CD for bidding, required
forms, and instructions. Bidders enter their Bid Item prices onto the supplied CD then print the form and deliver
in a sealed envelope; the Bid Form, completed CD, and required documents prior to the Bid due date and time.
(CD's cannot be used to submit bids to bidx.com)
Do not submit both Internet and Paper Bids. If so, the Internet bid and documents will be rejected.
BID OPENING: Bids will be publicly opened and read aloud at the Date and Time of the Bid Opening. The Bid
Opening will be held at the 'Paper Bid Delivered To' address shown above. Bidder bears the risk
of late delivery, bids received after the stated time will be returned unopened.
Attendance is not required. DelDOT offers a call-in number to hear the Bid Opening telephonically.
The telephone number to call is (302) 504-8986.
When prompted, enter Meeting number (access code): 651 529 280#
It is anticipated the telephone access information will remain the same for all Bid Openings.
B. PRE-BID MEETING: No
C. DBE GOAL: 0% Disadvantaged Business Enterprise Goal.
Pursuant to the Interim Final Rule ("IFR") issued by the United States Department of Transportation ("U.S. DOT")
on September 30, 2025, this letting does not have a DBE participation goal as all DelDOT DBEs were decertified
by the IFR. DelDOT is undertaking the recertification process for DBEs pursuant to the IFR requirements. As
DelDOT currently has no certified DBEs, it is not feasible to impose or enforce a DBE participation goal for this
letting. Upon completion of DelDOT's DBE recertification process, or upon any modification of the IFR, whether
through amendment, clarification, or judicial action, DelDOT reserves the right to revise or reestablish a DBE
participation goal for this letting as may be directed by the U.S. DOT and in accordance with applicable federal
regulations.
D. OJT TRAINEES: n/a
E. LOCATION: Sussex County
These improvements are more specifically shown on the Location Map(s) of the attached Plans.
F. DESCRIPTION: The improvements consist of furnishing all labor and materials for this project which is the demolition
and reconstruction of the Woodland Ferry Maintenance Facility. Follow other incidental construction in accordance
with the location, notes and details shown on the plans, and as directed by the Engineer.
G. BUY AMERICA REQUIREMENTS APPLY - Build America, Buy America Act, refer to 'GENERAL NOTICES'.
H. COMPLETION TIME: All work on this contract must be complete within 439 Calendar Days.
Extensions of contract time due to weather are specified in the Standard Specifications Section 108.7F, weather days.
It is estimated a Notice to Proceed is issued such that work starts on or about December 23, 2026.
remainder of page is blank
3 of 102
Contract No. T202280202
I. SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION, DELAWARE DEPARTMENT OF
TRANSPORTATION, JANUARY 2026 apply to this Bid Proposal and Project. The Contractor shall make himself
aware of any revisions and corrections and apply them to the applicable item(s) of this contract. The Standard
Specifications can be viewed here. Units of Measure can be found at 101.4.
J. ATTACHMENTS: Included as part of this Bid Proposal are; Project Plans; Questions & Answers (if posted);
Addenda, Referenced Documents, Documents Posted with this Bid Proposal; and Bid documents mailed to contractors.
K. ADDENDA: All Addenda are posted on the internet at bids.delaware.gov, and bidx.com/de/ and are included as part
of the Bid Proposal. The Bidder is responsible to check the Website as needed to ensure that the Bidder is aware of
Addenda that are included in the Bid Proposal. If Addenda are issued, the final Addendum will be posted no later than
the end of the day two business days prior to the bid date. Each Addendum number and issue date must be entered on
the submitted Certification Form. This original Bid Proposal will not be updated, you must refer to each Addendum.
L. QUESTIONS: E-MAIL TO; dot-ask@delaware.gov
Questions regarding this project are to be e-mailed to the above address no less than six business days prior to the bid
opening date in order to receive a posted response. Please include the Contract number in the subject line. Questions
and responses are posted at bids.delaware.gov, and bidx.com/de/. The date of the final posted Questions and Answers
document must be entered on the submitted Certification Form.
M. FLAGGERS:
A. Included in the Bid Proposal are the prevailing wages for highway construction as determined by the Department
of Labor of the State of Delaware in accordance with Title 29 Del. C. 6960, relating to wages and the regulations
implementing that Section.
B. Flaggers must be bid at a minimum equal to the Laborer wage rate and may be bid up to, but not to exceed, 3 times
the Laborer wage rate in accordance with the County where the Work is being performed.
C. The Department will adjust the bid to the minimum for prices bid below the minimum acceptable bid and to the
maximum for prices bid above the maximum allowable bid prior to award of the Contract.
1. Flagger overtime must be bid at minimum of 1.45 times and may be bid up to a maximum of 4.35 times, the
Laborer wage rate in accordance with the County where the Work is being performed.
2. When a Contract for a Project contains both Federal Davis-Bacon and State of Delaware prevailing wage
standards, the employer's minimum wage obligations are determined by whichever standards are higher.
D. Overtime:
1. Payment for overtime will be considered on a weekly basis for time worked in excess of 40 hours for a
continuous 7-day period beginning Monday and ending Sunday inclusive.
2. Time worked on other Projects or Work activities other than flagging will not be counted in the normal 40 hours
or the overtime.
E. The cost of the flagging operation when performed by others who are not the Contractor's employees will not be
included in the 50% subcontracting limit as outlined in Section 108.1.
N. PROSPECTIVE BIDDERS NOTES:
1. BIDDERS MUST BE REGISTERED with DelDOT in order to submit a bid. Registrations are now completed online
through SimpliGov. To complete registration or for more information, click here.
2. SURETY BOND - Each proposal must be accompanied by a deposit of either surety bond or security for a sum equal
to at least 10% of the amount bid.
3. DELAWARE'S CONTRACTOR REGISTRATION ACT - 19 Del.C. 3601 et seq, requires all contractors and
subcontractors to register with the Delaware Department of Labor before performing construction services or
maintenance. Refer to the GENERAL NOTICES section for further information.
4 of 102
Contract No. T202280202
4. DRUG TESTING - Regulation 4104; The state Office of Management and Budget has developed regulations that
require Contractors and Subcontractors to implement a program of mandatory drug testing for Employees who work on
Large Public Works Contracts funded all or in part with public funds pursuant to 29 Del.C. 6908(a)(6). Refer to the
full requirements at the following link:
https://regulations.delaware.gov/AdminCode/title19/4000/4100/4104.shtml#TopOfPage
Note a few of the requirements;
* At bid submission - Each bidder must submit with the bid a single signed affidavit certifying that the bidder and
its subcontractors has in place or will implement during the entire term of the contract a Mandatory Drug Testing
Program that complies with the regulation (a blank affidavit form is attached);
* At least two business days prior to contract execution - The awarded Contractor shall provide to DelDOT copies
of the Employee Drug Testing Program for the Contractor, each participating DBE firm, and all other listed
Subcontractors;
* Subcontractors - Contractors that employ Subcontractors on the job site may do so only after submitting a copy
of the Subcontractor's Employee Drug Testing Program along with the standard required subcontractor
information. A Subcontractor shall not commence work until DelDOT has approved the program in writing.
5. PERFORMANCE-BASED RATING SYSTEM - 29 Del.C. 6962 (c)(12)(a) requires DelDOT to include a
performance-based rating system for contractors. The Performance Rating for each Contractor shall be used as a
prequalification to bid at the time of bid. Refer to 'General Notices' for details.
6. NO RETAINAGE will be withheld on this contract unless through the Performance-Based Rating System.
7. EXTERNAL COMPLAINT PROCEDURE can be viewed on DelDOT's Website, Contractor Compliance/EEO -
Delaware Department of Transportation calling (302) 760-2035
REVISED
8. DBE PROGRAM REQUIREMENTS As a result of the Issuance of the IFR on September 30, 2025, all of DelDOT
DBEs were decertified. DelDOT is undertaking the recertification process for DBEs pursuant to the IFR requirements.
As DelDOT currently has no certified DBEs, it is not feasible to require the submission of a DelDOT DBE Project
Participation Affidavit for this letting. Companies bidding on this letting are NOT required to submit a DBE Project
Participation Affidavit with their bid. Once DelDOT has recertified DBEs using the IFR requirements, this
requirement will be reinstated.
REVISED
9. DelDOT CERTIFIED DBE UTILIZATION COMMITMENT STATEMENT As a result of the Issuance of the
IFR on September 30, 2025, all DelDOT DBEs were decertified. DelDOT is undertaking the recertification process
for DBEs pursuant to the IFR requirements. As DelDOT currently has no certified DBEs, it is not feasible to require
the submission of a DelDOT Certified DBE Utilization Commitment Statement for this letting. Companies bidding
on this letting are NOT required to submit a DelDOT Certified DBE Utilization Commitment Statement with their bid.
Once DelDOT has recertified DBEs using the IFR requirements, this requirement will be reinstated.
10. FLATWORK CONCRETE TECHNICIAN CERTIFICATION TRAINING:
Section 501.3, 503.3, 505.3, 610.3, 701.3 and 702.3 of the 2026 Standard Specifications require contractors to provide
an American Concrete Institute (ACI) or National Ready-Mix Concrete Association (NRMCA) certified concrete
flatwork technician to supervise all finishing of flatwork concrete.
11. BREAKOUT SHEETS MUST be submitted with your bid documents. Attach the breakout sheet(s) to the proposal.
Failure to submit the breakout sheet with the proposal will result in the Department declaring the proposal as non-
responsive and rejecting the bid.
12. NOTE that FHWA Form 1273 (attached) has been modified effective June 25, 2026. Changes are reviewed here.
remainder of page is blank
5 of 102
Contract No. T202280202
13. SIGNAGE LANGUAGE:
In order to maintain effective communication with the traveling public, only place signs, banners, flags, or other displays
within the projects limits that meet the requirements of the latest version of the Delaware Manual on Uniform Traffic
Control Devices. Any signs or other materials which deviate from the MUTCD, must be preapproved by the Engineer.
The only signage and materials which may be displayed upon vehicles and equipment within the Project area are signs
denoting the name of the Contractor and any subcontractors and other signs and/or materials required and approved
pursuant to the MUTCD and the Engineer. Contractor shall immediately remove any signs or materials within the
Project that does not meet these requirements immediately upon notification by the Engineer. Failure to remove signs
or other materials following notification from the Engineer will result in Liquidated Damages being assessed in the
manner and amount specified in the Standard Specifications section 108.9.A.
REVISED
14. BIDDERS LIST REQUIREMENT:
Under 49 CFR 26.11 DelDOT must collect bidders list information from ALL contractors and subcontractors who
seek to work on federally assisted contracts. The submitted information must be complete and must include the
required information for the prime and all (DBE and non-DBE) subcontractors, service providers, manufacturers,
distributors, and suppliers.
ALL bidders must complete the Bidders List Form (attached as an exhibit) and submit it at the time of bid.
Late submission of this information will not be accepted. Submitted information must include the following for
those being proposed to work on the contract if awarded:
Firm name;
Firm address including ZIP code;
Firm's status as a DBE or non-DBE (SEE NOTE BELOW effective 10-1-2025);
NAICS code applicable to each scope of work the firm sought to perform in its bid;
Age of the firm; and
The annual gross receipts of the firm shown as an approximate range (i.e., $1-3 million)
This information will be maintained as confidential to the extent allowable by federal and state law.
NOTE: Based upon the IFR issued September 30, 2025, all DelDOT certified DBEs have been decertified. As such,
for this letting, bidders should NOT identify in the bidders list whether a proposed contractor or subcontractor is a
DBE as no companies have currently been certified as a DBE under the new IFR requirements. That block should be
left blank. Bidders will be advised once DBE's have been re-certified pursuant to the requirements of the IFR at which
time bidders will be required to provide this information.
Additionally, pursuant to the IFR, and the guidance letter issued by U.S. DOT on September 30, 2025, DelDOT has
been directed not to use race or sex as presumptions for consideration of a company as a DBE. As such, bidders should
NOT identify in the bidders list a proposed contractor or subcontractor's sex or race. Those blocks should be left
blank. DelDOT anticipates providing a revised Bidders List Form in the near future, which contains only those sections
required by the IFR.
Failure to submit the required bidders list documentation at the time bid will result in the bidder being
deemed non-responsive and therefore ineligible for award of the contract.
15. APPENDIX A is posted and part of this Bid Proposal.
16. REVISED SPEC LANGUAGE:
The Revised Inspection Framework - January 2026 (2026 Inspection Framework) shall apply to this contract.
remainder of page is blank
6 of 102
| Primary inspection. The inspection (formerly referred to as Final Inspection) conducted by the engineer to |
|---|
| determine if the contractor has satisfactorily completed the project, or a portion of the project, in accordance |
| with the contract. |
| Acceptance Inspection. The inspection (formerly referred to as Primary Inspection) conducted by the |
|---|
| Administering Section, contractor, and accepting section confirming that primary inspection punch list items |
| have been addressed. |
| Primary inspection. The inspection (formerly referred to as initial inspection) conducted by the Department |
|---|
| to review all contract work has been completed in accordance with the Plans, Standard Specifications, Special |
| Provisions, and Standard Construction Details. The inspection is confirmation of the work completed per the |
| contract documents. |
| Project Acceptance. The Department's notification to the Contractor that the time charges will cease, and |
|---|
| construction activities are completed, releasing the contractor from liability and repairs or maintenance to the |
| completed work. |
Contract No. T202280202
Delete from Section 101.3
Primary inspection. The inspection (formerly referred to as Final Inspection) conducted by the engineer to
determine if the contractor has satisfactorily completed the project, or a portion of the project, in accordance
with the contract.
Insert within Section 101.3
Acceptance Inspection. The inspection (formerly referred to as Primary Inspection) conducted by the
Administering Section, contractor, and accepting section confirming that primary inspection punch list items
have been addressed.
Primary inspection. The inspection (formerly referred to as initial inspection) conducted by the Department
to review all contract work has been completed in accordance with the Plans, Standard Specifications, Special
Provisions, and Standard Construction Details. The inspection is confirmation of the work completed per the
contract documents.
Project Acceptance. The Department's notification to the Contractor that the time charges will cease, and
construction activities are completed, releasing the contractor from liability and repairs or maintenance to the
completed work.
Revise Section 104.12.A as follows.
A. Before acceptance inspection, clean rubbish, excess materials, temporary structures, and equipment
from the project, from any publicly owned borrow source used to complete the work, and from areas
affected by the contractor in connection with the work within the right-of-way. Cut all grass and weeds
taller than 6-inches. The cost of the final cleanup is incidental to Item 763000, Initial Expense, De-
Mobilization.
Revise Section 105.4.F as follows.
F. Submit copies of manufacturer's catalog cuts, drawings, wiring diagrams, and other relevant
documents with working drawings for electrical and mechanical equipment. After the Department has
reviewed all items of a particular system, prepare an instruction book for the particular system. Fasten
and bind the items listed below in a leather or heavy plastic cover book with a title clearly shown.
Provide five copies of the book to the engineer before acceptance inspection. Make the books available
when connecting and energizing electrical and mechanical systems. Ensure that the final bound copies
reflect changes or adjustments made during the work. Include the following in the instruction book:
1. An equipment list.
2. A complete description of the equipment.
3. The sequence of operation including inter-locking and protective features.
4. The use of by-pass switches.
5. A detailed description of all wiring circuits.
6. A recommended spare parts list.
7. Renewal parts bulletins.
8. Instruction bulletins for the provided equipment.
9. Diagrams and drawings of reduced size suitable for binding.
10. An index listing all items.
Revise Section 105.13.D as follows.
D. Include the cost of maintenance work during construction and before completion of the acceptance
inspection punch list in the proposal. The Department will pay the cost of maintenance work occurring
after completion of the acceptance inspection punch list.
remainder of page is blank
7 of 102
| The Department will cease counting contract time when the project reaches substantial completion |
|---|
| as defined in Section 101.3, Definitions. |
| Substantial Completion Verification |
| Upon receiving the contractor's notice of substantial completion of the project, the Department |
|---|
| will verify all contract items are complete as defined in Section 101.3, Definitions. Items not |
| deemed complete shall be completed by contractor prior to Department issuance of Substantial |
| Completion. |
| After issuance of Substantial Completion, request Primary Inspection from the Department. |
| The Department will schedule the Primary Inspection within 30 calendar days of the request. |
| The Department/Administering Section will conduct a Primary Inspection with the completion | |
|---|---|
| of 105.16.2 Substantial Completion Verification. The Administering Section will note and | |
| provide a written punch list by stations and in detail identifying work or conditions requiring | |
| correction. The punch list will include ADA inspection deficiencies. | |
| Perform the corrective work noted on the punch list within 30 calendar days upon receipt of | |
| the punch list created by the Administering Section, unless the parties mutually agree to extend | |
| the time frame. | |
| Upon completion of the primary inspection punch list, request an acceptance inspection from | |
| the Department. Prior to acceptance inspection scheduling, the Administering Section will | |
| confirm and annotate the primary inspection punch list and ensure ADA Inspection deficiencies | |
| have been addressed and documented. | |
| The Administering Section will schedule Acceptance inspection with the | Maintenance District |
| within 30 days of confirmation of primary punch list item completion. |
| The Department will conduct an acceptance inspection with the completion of 105.16.B.3, |
|---|
| primary inspection. The Administering Section will provide a written punch list identifying |
| deficiencies not satisfactorily addressed from the primary inspection punch list within 7 |
| calendar days of the acceptance inspection. |
| Perform the corrective work noted on the punch list within 15 calendar days upon receipt of |
| the punch list created by the Administering Section, unless the parties mutually agree to extend |
| the time frame. |
Contract No. T202280202
Revise Section 105.14.A as follows.
A. The engineer may order opening of certain sections of the work to traffic or other use before the
contractor completes the work or before the engineer accepts the work. The Department will not
consider opening sections of the work as constituting acceptance of the work or a waiver of any
contract provisions. The engineer will pay the cost of repairing damage to the work caused by opening
work to vehicular traffic unless opening the roadway is due to the fault, or inactivity of, the contractor
or the contractor caused the damage. All other maintenance costs including, but not limited to, mowing
grass and general cleanup are the contractor's responsibility until completion of the acceptance
inspection punch list to the Department's satisfaction. Maintenance costs for work involving
landscaping and vegetative growth are the contractor's responsibility until final acceptance.
Revise Section 105.16 as follows.
A. Partial Acceptance.
1. The decision to partially accept a portion of the project is solely at the discretion of the engineer.
The engineer may partially accept portions of the work. The Department will not consider partial
acceptance as constituting acceptance of the work that has not been partially accepted or a waiver
of any contract provisions. The Department will maintain the partially accepted portion of the
project, including repairing damage caused by the public.
B. Project Acceptance
1. The Department will cease counting contract time when the project reaches substantial completion
as defined in Section 101.3, Definitions.
2. Substantial Completion Verification
a. Upon receiving the contractor's notice of substantial completion of the project, the Department
will verify all contract items are complete as defined in Section 101.3, Definitions. Items not
deemed complete shall be completed by contractor prior to Department issuance of Substantial
Completion.
b. After issuance of Substantial Completion, request Primary Inspection from the Department.
c. The Department will schedule the Primary Inspection within 30 calendar days of the request.
3. Primary Inspection
a. The Department/Administering Section will conduct a Primary Inspection with the completion
of 105.16.2 Substantial Completion Verification. The Administering Section will note and
provide a written punch list by stations and in detail identifying work or conditions requiring
correction. The punch list will include ADA inspection deficiencies.
b. Perform the corrective work noted on the punch list within 30 calendar days upon receipt of
the punch list created by the Administering Section, unless the parties mutually agree to extend
the time frame.
c. Upon completion of the primary inspection punch list, request an acceptance inspection from
the Department. Prior to acceptance inspection scheduling, the Administering Section will
confirm and annotate the primary inspection punch list and ensure ADA Inspection deficiencies
have been addressed and documented.
d. The Administering Section will schedule Acceptance inspection with the Maintenance District
within 30 days of confirmation of primary punch list item completion.
4. Acceptance (formerly primary) Inspection.
a. The Department will conduct an acceptance inspection with the completion of 105.16.B.3,
primary inspection. The Administering Section will provide a written punch list identifying
deficiencies not satisfactorily addressed from the primary inspection punch list within 7
calendar days of the acceptance inspection.
b. Perform the corrective work noted on the punch list within 15 calendar days upon receipt of
the punch list created by the Administering Section, unless the parties mutually agree to extend
the time frame.
8 of 102
| The Administering Section will verify remediation work and will provide a list with dates that | |
|---|---|
| remedial activities were resolved to the Maintenance District when requesting Project | |
| Acceptance. | |
| Project Acceptance |
| The Administering Section will notify the Maintenance District that acceptance inspection punch |
|---|
| list items have been addressed. |
| The Maintenance District and/or other accepting entities will verify acceptance inspection punch |
| list items have been addressed within 30 calendar days of notice from the Administering Section. |
Contract No. T202280202
c. The Administering Section will verify remediation work and will provide a list with dates that
remedial activities were resolved to the Maintenance District when requesting Project
Acceptance.
C. Project Acceptance
1. The Administering Section will notify the Maintenance District that acceptance inspection punch
list items have been addressed.
2. The Maintenance District and/or other accepting entities will verify acceptance inspection punch
list items have been addressed within 30 calendar days of notice from the Administering Section.
D. Final Acceptance
1. The engineer will provide final acceptance in writing that will state the acceptance date as defined
in Section 101.3, Definitions.
E. Project Closeout
1. Upon final acceptance, provide the exempted documents, certificates, or proofs of compliance
within 90 calendar days.
2. The Department will not issue the final payment until the contractor executes and delivers the
required documents.
Revise Section 108.8.K as follows.
K. Once the Department determines that the work is substantially complete, the Department will suspend
time charges and the assessment of liquidated damages. Failure to complete all punch list work
identified during the primary and acceptance inspections within the timeframes allotted, will result in
the Department restarting liquidated damages in accordance with the chart specified in Section 108.9,
Schedule of Liquidated Damages. The assessment of post-substantial-completion liquidated damages
will continue until project completion.
Revise Section 610.3.9.A.2 as follows.
2. The engineer will measure the width, length, and depth of each crack and establish the precise location
of the crack termination points relative to permanent reference points on the member. The engineer
will monitor and document the growth of individual cracks at an inspection interval the engineer will
choose to determine if cracks are active or dormant after acceptance inspection.
Revise Section 722.3.2.A as follows.
A. Provide on-site field instruction by the system manufacturer, at a location determined by the engineer.
Provide a minimum of 2 training sessions consisting of installation training before beginning cable
barrier construction and maintenance training before acceptance inspection. The manufacturer shall
establish the training duration and shall provide field training on all aspects of the system. Coordinate
the training schedule and location with the engineer. The engineer will advise the appropriate
department staff, including construction inspectors and maintenance personnel regarding the training
location and schedule. Provide all training materials in both hard copy and electronic PDF format.
Revise Section 722.3.2.C.1 as follows.
1. Hold the maintenance training a minimum of 7 calendar days before acceptance inspection of the
system. Submit the proposed training date to the engineer a minimum of 14 calendar days prior to the
training session date for review and approval. Include the following participants:
a. District Maintenance Engineer, or designated representative;
b. District Maintenance Superintendent, or designated representative;
c. Area Yard Supervisor, or designated representative; and
d. District maintenance personnel.
remainder of page is blank
9 of 102
Contract No. T202280202
Revise Section 722.3.3.L as follows.
L. Within 10 calendar days of the primary inspection, supply spare parts for the HTCB system. Deliver
the parts to the DelDOT maintenance facility as directed by the engineer. Provide an extra supply of
the following:
1. Socketed-type line posts, including post hardware, caps, reflective sheeting, straps, spacers, and
socket covers. Include 200 posts and accessories.
2. Rigging screws and threaded terminals. Provide enough materials to complete 8 turnbuckle
assemblies.
3. Anchor posts including post hardware and caps, reflective sheeting, straps, fittings, spacers, and
socket covers. Provide enough materials to complete 3 end anchor installations.
4. Fitting gaskets or socket covers. Provide 100 socket covers.
Revise Section 843.3.5.C as follows.
C. Repair defects identified by the Department during periodic or primary inspections in accordance with
this specification, including all highway lighting systems and components within the project limits.
Begin highway lighting system repairs immediately following notice of the lighting system defect
unless weather limitations prevent the corrective work. Provide notification to the Department before
beginning corrective work.
Revise Section 843.3.5.D as follows.
D. The Department will not consider the highway lighting system as substantially complete until
correction of the deficiencies noted during the primary and acceptance inspections. Provide a
maintenance bond for item 843001 - Electrical Testing upon substantial completion. Provide a
maintenance bond meeting the following requirements:
1. A bond sum equal to 100 percent of the value of all highway lighting system items the Department
paid to the contractor;
2. With original signatures, in ink, and not mechanical reproductions or facsimiles of any kind,
naming the contractor as the principle;
3. term of 1-year beyond the completion of the highway lighting system work; and
4. written by a surety or insurance company licensed to write surety bonds in the State of Delaware
by the Delaware Department of Insurance.
Revise 911.3.6.G as follows.
G. Water bi-weekly during the period June 15 through October 1. Continue watering, without interruption,
until completing watering of all the plants on the project. Use water in accordance with Section 911.2.9.
The Department will allow use of tree watering bags as a part of the watering operation. Remove the
tree watering bags before acceptance inspection.
- end -
remainder of page is blank
10 of 102

With GovernmentContracts, you can:
Upcoming Purchases & Bid Solicitations Upcoming Purchases and Bid Solicitations Request For Proposals
Delaware River Port Authority
Bid Due: 11/18/2026
Bid Status Details forDHCI Fire Alarm System ReplacementOMB-MC3514000083 Important Specific Message MANDATORY PRE-BID
State Government of Delaware
Bid Due: 12/03/2026
Bid Information Bid Type Competitive Grant Bid Number RFA - Redding OST FY27
State government of Delaware
Bid Due: 11/19/2026
RFP DAR-2027-0518: Advancement CRM Platform, Implementation and Advisory Services The University of Delaware
University of Delaware
Bid Due: 11/18/2026