| Location: | Georgia |
|---|---|
| Posted: | Jul 22, 2025 |
| Due: | Aug 12, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | W912HN25B5008 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
Amendment 0001: publishes Pre-Bid Conference slides, Attendee List and updated specs and drawings(posted 18July),
The contractor will be required to close one man-made cut in the salt marsh north of the Satilla River in Camden County, GA: Noyes Cut (approximate location: 31.0101° N, 81.5466° W). This work is part of the Noyes Cut Ecosystem Restoration Project and has the objective of increasing tidal exchange throughout the system, restoring salinity gradients to Dover Creek, and reducing shoaling in Umbrella Creek.
The site is remote and only accessible by water. It is located approximately 10 linear miles south of Brunswick, GA and is 11 linear miles from the Woodbine boat ramp located at 103 E 1st St, Woodbine, GA, 31569 and 8 linear miles from the Tidelands Nature Center boat ramp located at 100 S Riverview Dr, Jekyll Island, GA 31527. The site is subject to large tidal variations typical to the GA coast and the site may not be accessible at all tide stages for all types of equipment. The contractor will verify site accessibility for selected equipment. Vessel traffic in the vicinity of the site is expected to be minimal and limited to occasional recreational boaters and small commercial crab fishing boats.
The cut closure structure will consist of a trapezoidal rubble mound-type structure with a 3:1H:V slope and an approximately length of 495 ft at Noyes Cut. The width at the crest will be approximately 6 ft for each structure. The structure will be made entirely of GDOT Type I riprap. The current estimate for rock quantities is approximately 21,000 tons for Noyes Cut. The contractor will be responsible for furnishing, stockpiling, and placement of all rock.
The rock will be carefully placed within the template using approved equipment in a manner to produce a wellgraded mass of rock and to minimize impacts to fish and wildlife. The contractor will install aids to navigation consisting of signs and other markings mounted on pile foundations at each cut closure location.
| Jun 16, 2025 | [Presolicitation (Updated)] Noyes Cut Ecosystem Restoration Phase Two |
| Jul 14, 2025 | [Solicitation (Original)] Noyes Cut Ecosystem Restoration Phase Two |
| Jul 18, 2025 | [Solicitation (Updated)] Noyes Cut Ecosystem Restoration Phase Two |
| Aug 6, 2025 | [Solicitation (Updated)] Noyes Cut Ecosystem Restoration Phase Two |
| Aug 14, 2025 | [Solicitation (Updated)] Noyes Cut Ecosystem Restoration Phase Two |

With GovernmentContracts, you can:
RP029-07Add1 12/31/99 Furnish and Install Passive GPS Vehicle Tracking System Copyright 2007, Gwinnett
Gwinnett County
Bid Due: 12/31/2099
Project # FC-5173 Change Notice PLEASE SEND DISCLAIMER IN THE ATTACHMENT REGARDING DATES
City of Atlanta
Bid Due: 12/31/2099
Bid Number: 053-43 Bid Title: GENERAL CONTRACTOR FOR HIRE FOR TWO FIRE STATION
Hall County
Bid Due:
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-63850-NONST-2025-000000019
State Government of Georgia
Bid Due: 9/30/2031