Project: Pottsville Street Stormwater Improvements
Location: Pottsville Street, Herndon Borough, Northumberland County, PA
Solicited by: Tonia Troup, Project Coordinator, SEDA-COG
?? 201 Furnace Road, Lewisburg, PA 17837
?? (570) 524-4491
??
www.seda-cog.org
?? Publication Date: June 27, 2025
?? Submission Deadline: July 22, 2025, by 10:00 AM (prevailing time)
Submit three (3) sealed hard copies
Clearly mark envelope:
"Engineering Services Quotation – Pottsville Street"
Deliver to:
Tonia Troup, Project Coordinator
SEDA-COG, 201 Furnace Road, Lewisburg, PA 17837
No faxed or emailed submissions accepted
Funded by a Community Development Block Grant (CDBG)
Purpose: Mitigate stormwater issues on Pottsville Street and restore roadway
Scope includes:
2 new box inlets
18" corrugated plastic piping
4" rolled curb on both sides
Milling and resurfacing with base and wearing courses
Re-grading for proper drainage
Full design and documentation
All necessary permits (excluding surveys/environmental/historic reviews)
Bidding coordination and contract administration
Pre- and post-construction meetings
Site visits and final inspection
“As Built” drawings (1 hard copy + 1 digital)
Adherence to PA Prevailing Wage Rates
Kick-off
Two development meetings
Final design approval/ad readiness
Preconstruction coordination
Optional pre-bid meeting
Bid opening and award recommendation
Preconstruction conference
Indicate any additional meetings and associated costs on the estimate form.
Bidding & Contract CoordinationPrepare and distribute bid documents (up to 10 sets)
Manage ad placements (ad costs reimbursed by Borough)
Provide bid tabulation, award recommendation, contract execution support
Issue:
Notice of Intent to Award
Notice to Proceed
Final completion documents
Minimum 2 site visits + final inspection
Monitor conformance, review submittals, disapprove non-compliant work
Review and approve payment requests
Serve as Borough’s site representative
Frequency of visits must be estimated in quotation based on projected timeline
(Costs will not be adjusted if duration changes)
Project design and construction documents
Cost estimates at preliminary and final stages
Project design timeline with milestones
List of subconsultants (if applicable)
Final “As Built” drawings (physical + digital)
Lump sum contract (includes all services and reimbursables)
Monthly billing based on percentage completed
Payment contingent on DCED disbursement
MBE: 5%
WBE: 3%
(for projects with CDBG/ESG/HOME funds)
Applies only to construction contracts over $200,000
Engineer should support client’s compliance with:
25% of labor hours = Section 3 workers
5% of labor hours = Targeted Section 3 workers
Professional services labor hours may count but must be reported separately
Quotations will be scored on:
Responsiveness to RFQ
Relevant experience and past performance
Quality of previous work
Resources and track record of timely completion
Cost
Commitment to MBE/WBE participation
Completed Standard Engineering Estimate
Minimum of two (2) references (similar projects, last 3 years)
MBE/WBE Certification (if applicable)
Solicitation & Commitment Statement
Professional Liability Insurance coverage limits
Tonia Troup
??
ttroup@seda-cog.org
?? (570) 524-4491
| Attachment | Size |
| RFQ ENGINEERING SERVICES_0.pdf | 155.41 KB |

With GovernmentContracts, you can:
...-to-residential conversion, housing production, commercial activation, public realm improvements... production, commercial activation, public ...
Urban Redevelopment Authority of Pittsburgh
Bid Due: 6/26/2026
...-to-residential conversion, housing production, commercial activation, public realm improvements...-to-residential conversion, housing production, commercial ...
Urban Redevelopment Authority of Pittsburgh
Bid Due: 6/26/2026