RFQ: Demolition 2023 - 429 & 431 E Third Street

Location: Pennsylvania
Posted: Jun 27, 2025
Due: Jul 15, 2025
Agency: The Enterprise Center
Type of Government: State & Local
Category:
  • 80 - Brushes, Paints, Sealers, and Adhesives
Publication URL: To access bid details, please log in.
RFQ: Demolition 2023 – 429 & 431 E Third Street
June 27, 2025

Project: Demolition 2023 – 429 & 431 E Third Street
Location: Mount Carmel Borough, Northumberland County, PA
Solicited by: Tonia Troup, Project Coordinator, SEDA-COG
?? 201 Furnace Road, Lewisburg, PA 17837
?? (570) 524-4491
?? www.seda-cog.org

Key Dates
  • RFQ Publication Date: June 27, 2025

  • Submission Deadline: July 15, 2025, by 2:00 PM (prevailing time)

  • Bid Opening: Publicly opened at the SEDA-COG Board Room

  • Submission Method: 3 hard copies, sealed and clearly marked
    “Engineering Services Quotation”

    • No faxed or emailed submissions accepted

Project Description

Demolition of a condemned, vacant structure at 429 & 431 E 3rd Street and full restoration of the lot per Borough specifications. Work includes:

  • Property inspection and hazardous materials assessment

  • Compliance with PA asbestos abatement and demolition regulations

  • No redevelopment or reuse planned

  • Funded by a Community Development Block Grant (CDBG)

Scope of Services
  • Design Phase:

    • Full architectural and engineering plans

    • Demolition plans, permitting, specs, and cost estimates

    • Meeting attendance (4 design + 4 preconstruction)

  • Bidding Phase:

    • Prepare complete bid documents and legal ads

    • Coordinate up to 10 bid package distributions

    • Manage contract award process (notices, agreements, closeout)

  • Construction Supervision:

    • Minimum two (2) site visits + final inspection

    • Review shop drawings, submittals, and payment requests

    • Prepare and deliver “As Built” plans (1 hard copy + 1 digital)

All permit fees are to be paid by the Engineer and included in the quote.
Surveys, environmental, SHPO, or archaeological reviews are excluded.

Required Meetings
  • Kick-off + 2 development sessions

  • Final design presentation/approval

  • Pre-bid and bid opening (optional)

  • Preconstruction conference
    Additional meetings must be listed with costs on the estimate form.

Deliverables
  • Standard Engineering Estimate Form

  • Design schedule with key milestones

  • List of subconsultants (if any)

  • Opinion of probable construction costs at preliminary and final design phases

  • Final plans/specs for Borough approval

Contract and Payment Terms
  • Engineer to sign Professional Services Agreement with the Borough

  • Lump sum contract includes all fees and reimbursables

  • Monthly invoicing based on percent complete

  • Payment contingent on DCED fund disbursement

Compliance & GoalsMBE/WBE Participation Goals
  • MBE: 5%

  • WBE: 3%

Section 3 Guidelines (24 CFR Part 75)
  • Applies to federal projects over $200,000

  • While Section 3 does not apply to professional services, participation and assistance in Section 3 compliance are encouraged.

Evaluation Criteria

Quotations will be evaluated based on:

  1. Responsiveness to RFQ

  2. Relevant experience and past performance

  3. Quality of previous work

  4. Resources and record of timely project delivery

  5. Cost

  6. Commitment to MBE/WBE participation

Required Attachments
  • Completed Standard Engineering Estimate Form

  • At least two (2) similar project references (last 3 years)

  • MBE/WBE certification (if applicable)

  • MBE/WBE Solicitation & Commitment Statement

  • Professional Liability Insurance coverage limits

The Borough of Mount Carmel reserves the right to reject any or all quotations or waive irregularities.

Related Links
Attachment Size
RFQ ENGINEERING SERVICES.pdf 141.27 KB
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Facility: Lower Hill Project: Post-Option Agreement Lower Hill Redevelopment Pre-Proposal Meeting...

Sports & Exhibition Authority of Pittsburgh and Allegheny County (SEA)

Bid Due: 6/18/2026

...Facility: Lower Hill Project: Post-Option Agreement Lower Hill Redevelopment Pre-Proposal Meeting...

Sports & Exhibition Authority of Pittsburgh and Allegheny County (SEA)

Bid Due: 6/18/2026

...Facility: Lower Hill Project: Post-Option Agreement Lower Hill Redevelopment Pre-Proposal Meeting...

Sports & Exhibition Authority of Pittsburgh and Allegheny County (SEA)

Bid Due: 6/18/2026

...Project: RFP for Acquisition and Redevelopment of 802 Walnut Street Allentown, PA 18102 ...

PennBid

Bid Due: 7/10/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.