Project Description: BASE BID – NOTTINGHAM DRIVE AND KINGSDALE ROAD
This project involves the installation of approximately 410 lineal feet of 15” SLCPP Storm Sewer pipe; plugging, grouting, and abandonment of existing 15” storm sewer; removal and replacement of approximately 385 lineal feet of 36” CMP Storm Sewer Pipe with 36” SLCPP Storm Sewer Pipe; installation of PennDOT Type M Catch Basins; connections to existing infrastructure; mobilization, demobilization, bonding, site preparation, site protection, site restoration; concrete and asphalt restoration; traffic control, utility notification and coordination, resident notification and coordination; tree removals; NASSCO Post CCTV; and all other materials, labor, and appurtenances required to perform the Work, complete in place.
ADD ALTERNATE BID – KINGSDALE ROAD
This project involves the removal and replacement of approximately 130 lineal feet of 36” CMP Storm Sewer Pipe with 36” SLCPP Storm Sewer Pipe; installation of precast concrete endwall; connections to existing infrastructure; mobilization, demobilization, bonding, site preparation, site protection, site restoration; traffic control, utility notification and coordination, resident notification and coordination; tree removals; NASSCO Post CCTV; and all other materials, labor, and appurtenances required to perform the Work, complete in place.

With GovernmentContracts, you can:
...of the Pittsburgh Water and Sewer Authority public sewer system including storm, sanitary, ...
Pittsburgh Water & Sewer Authority
Bid Due: 11/17/2026
...- Construction, Sewer and Storm Drain Responses due: December 31, 2026 Posted by: ...
City of Philadelphia
Bid Due: 12/31/2026
...Work: Removal and replacement of existing concrete storm sewer structures, 18-inch CMP pipe..., ...
PennBid
Bid Due: 10/30/2026
...and installation of all water, sanitary sewer, storm sewer, floor drains, underground and ...
PennBid