The City of Lathrop Department of Public Works is inviting qualified engineering firms to submit proposals for the O Street Wastewater Pump Station Project (CIP WW 26-22). This project involves replacing the existing wastewater pump station with a new facility designed to increase capacity and improve operational efficiency.
The proposed project will replace the existing O Street Pump Station with a new facility to be constructed on a corner of the Lathrop Elementary School property, across the street from the current site. The new station will connect to the existing gravity and force mains along O Street. The project scope includes installation of two (2) 15-horsepower pumps equipped with variable frequency drives (VFDs) to accommodate Peak Wet Weather Flow (PWWF) and Total Dynamic Head (TDH) at ultimate buildout conditions. Additionally, one (1) 5-horsepower pump will be installed at the existing O Street Pump Station to support low-flow operations.
The Request for Proposals (RFP) includes detailed information on project scope, submittal requirements, and the selection process.
Interested firms are encouraged to review the RFP and submit their proposals by November 18, 2025 (by 5:00 PM).

With GovernmentContracts, you can:
...Project ID: Title: Anza Stormwater Pump Station SCADA Upgrade Project Addenda: 0 Release ...
City of Pacifica
Bid Due: 8/28/2026
...Project Name Wasserman OR Booster Chiller Installation (opens in new tab, PDF) Project ...
UCLA Capital Programs
Bid Due: 7/28/2026
...of work includes the installation of a new microprocessor controller, pump/power unit, closed-loop ...
UCLA Capital Programs
Bid Due: 8/04/2026
...contractor shall perform the following task(s) as follows: Procurement and installation of two ...
DEPT OF DEFENSE
Bid Due: 7/27/2026