| Location: | California |
|---|---|
| Posted: | Oct 29, 2025 |
| Due: | Nov 18, 2025 |
| Agency: | City of Lathrop |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The City of Lathrop Department of Public Works is inviting qualified engineering firms to submit proposals for the O Street Wastewater Pump Station Project (CIP WW 26-22). This project involves replacing the existing wastewater pump station with a new facility designed to increase capacity and improve operational efficiency.
The proposed project will replace the existing O Street Pump Station with a new facility to be constructed on a corner of the Lathrop Elementary School property, across the street from the current site. The new station will connect to the existing gravity and force mains along O Street. The project scope includes installation of two (2) 15-horsepower pumps equipped with variable frequency drives (VFDs) to accommodate Peak Wet Weather Flow (PWWF) and Total Dynamic Head (TDH) at ultimate buildout conditions. Additionally, one (1) 5-horsepower pump will be installed at the existing O Street Pump Station to support low-flow operations.
The Request for Proposals (RFP) includes detailed information on project scope, submittal requirements, and the selection process.
Interested firms are encouraged to review the RFP and submit their proposals by November 18, 2025 (by 5:00 PM).

With GovernmentContracts, you can:
...Notice Inviting Bids/Request For Proposal Bid Status Bid Tabulation Awardee CMSD Phase 2 ...
Costa Mesa Sanitary District
Bid Due: 7/02/2026
...Notice Inviting Bids/Request For Proposal Bid Status Bid Tabulation Awardee CMSD Phase 2 ...
Costa Mesa Sanitary District
Bid Due: 7/02/2026
...Station. The Bryte Pump Station is located at the eastern end of Citrus ...
City of West Sacramento
Bid Due: 6/25/2026
..., May 28, 2026, at 10:00 AM promptly at the Stockton Regional Wastewater ...
City of Stockton
Bid Due: 6/18/2026