| Location: | California |
|---|---|
| Posted: | Nov 19, 2025 |
| Due: | Dec 12, 2025 |
| Agency: | City of Brentwood |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 592-59202 |
| Publication URL: | To access bid details, please log in. |
The City of Brentwood requests proposals from qualified individuals or firms for engineering design services for its Citywide Non-Potable Water Distribution Project, CIP Project No. 592-59202.
Questions or objections relating to the Request for Proposal (“RFP”), the RFP attachments, the RFP procedures, the Project, or the required Services may only be submitted via email to Meghan Oliveira, Associate Engineer, at moliveira@brentwoodca.gov by 4:00 p.m., Friday, December 5, 2025
Proposals must be received by the City by or before Friday, December 12, 2025 at 4:00 p.m. Pacific Daylight Time. Respondent must submit one copy of the Proposal in electronic format (pdf or Word) via email to Meghan Oliveira, Associate Engineer at moliveira@brentwoodca.gov with the subject line stating: “Proposal for Citywide NPW Project” by the Proposal Deadline. Late submissions will be disregarded.

With GovernmentContracts, you can:
...Water Distribution Repair Parts Department: Operations, Finance, Project 184 Category: Request... notice that ...
El Dorado Irrigation District
Bid Due: 6/16/2026
...and distribution system includes three separate and distinct water supply and distribution systems... ...
Mission Springs Water District
Bid Due: 6/12/2026
...Valley Power Distribution System 2026 (RFP-25-018) The Orange County Water District ("OCWD" or ...
Orange County Water District
Bid Due: 7/07/2026
...Valley Power Distribution System 2026 (RFP-25-018) The Orange County Water District ("OCWD" or ...
Orange County Water District
Bid Due: 7/07/2026