| Location: | New Mexico |
|---|---|
| Posted: | Aug 24, 2026 |
| Due: | Sep 17, 2026 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | FA940126R0023 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
The primary purpose and objective of this project is to outline the scope for the design and construction of a new 7,900 feet high-pressure waterline, appurtenant systems, and associated control systems on the southeast side of KAFB. This project shall provide a robust and reliable water supply from Pump Station 2 (PS2) to the SOR and HERTF reservoirs, replacing and upgrading existing infrastructure. This includes an 8-inch, Class 350 Ductile Iron Pipe (DIP) with cement-mortar lining and an asphaltic seal coat and all associated valves and fittings, upgrade the existing control system to add SCADA to the newly installed system, Portable Hoist for Pump and Motor Maintenance, a new 15,000-gallon tank to include a booster pumps to be installed prior to the PS2, and a new 5,000-gallon tank and pre-packaged pump station at the SOR site.
A site visit will be held on 03 September 2026 at 1300 MST and all parties will meet at the Truman Gate Visitors Center to be sponsored onto base at 1200 MST.
Please submit the full names, date of birth, and citzenship of your attendees NLT COB 28 August 2026 and advise if you require base passes to access Kirtland AFB to the Mrs. Abigail Crespin, abigail.crespin@us.af.mil and TSgt Hillarie Johnson, hillarie.johnson@us.af.mil.
All responsible sources may submit a quotation, bid, or proposal, as appropriate, which will be considered by the agency.
Equitable Adjustments will be IAW RFO 52.212-4.
Contractor Access to CUI attachments: If a contractor is accessing request to a restricted, government only document, they would need to submit the DD2345 for their company as part of their request. The justification (relevant business activity) in Block 4 of the DD2345 is used to determine access to controlled information they are requesting. Typically, companies include something about bidding on contracts as part of their relevant business activity. Submit a completed copy of the DD 2345 to the JCP link.
| Aug 26, 2026 | [Solicitation (Updated)] SOR Waterline Repair |
| Sep 2, 2026 | [Solicitation (Updated)] SOR Waterline Repair |
| Sep 11, 2026 | [Solicitation (Updated)] SOR Waterline Repair |

With GovernmentContracts, you can:
...Chemistry Building Renovation Design Chemistry Building Renovation Design Open: 9/3/2026, 8:30 AM...
New Mexico State University
Bid Due: 10/01/2026
...Chemistry Building Renovation Design Chemistry Building Renovation Design Open: 9/3/2026, 8:30 AM...
New Mexico State University
Bid Due: 10/06/2026
...Follow STAR-FISH CALL 017 - Secure By Design Active Contract Opportunity Notice ID ...
DEPT OF DEFENSE
Bid Due: 10/12/2026
...27-0013 Architectural and Engineering design services for the Dona Ana County North Rec ...
County of Doa Ana
Bid Due: 10/06/2026