| Location: | Arizona |
|---|---|
| Posted: | Jun 11, 2026 |
| Due: | Jun 22, 2026 |
| Agency: | HEALTH AND HUMAN SERVICES, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | IHS1526896 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
The scope of work includes providing monthly onsite inspections, water testing, and chemical water treating for the Central Plant cooling towers, Central Plant condensing boilers, Central Plant water softener, Central Plant heating closed loop, Central Plant cooling closed loop, SSB cooling tower, and SSB closed loop. The contractor shall also test and report the makeup water characteristics. The contractor shall chemically treat the water to keep systems free from scale, corrosion, and microbiological contamination. The contractor shall also treat the water to keep from freezing. The results of these inspections and testing along with the associated chemical treatment actions shall be summarized in a monthly report to the COR. The contractor shall provide all chemical testing reagents, testing kits, testing instrumentation, and treatment chemicals. Testing shall occur mid-month to ensure testing occurs during each calendar month as required by Joint Commission standards.
| Jul 28, 2026 | [Combined Synopsis/Solicitation (Original)] Whiteriver Service Unit Water Treatment Services |
| Aug 4, 2026 | [Combined Synopsis/Solicitation (Updated)] Amendment 1 - Site Visit and Questions and Answers posted Whiteriver Service Unit Water Treatment Services |
| Aug 8, 2026 | [Combined Synopsis/Solicitation (Updated)] Amendment 2 - Closing Date Extension, Revision to SOW, Additional pictures - Whiteriver Service Unit Water Treatment Services |
| Aug 15, 2026 | [Combined Synopsis/Solicitation (Updated)] Amendment 3 - Questions and Answers and Closing Extension Date - Whiteriver Service Unit Water Treatment Services |

With GovernmentContracts, you can:
...Follow F--SERVICE FOR ATLANTIUM UV WATER TREATMENT SYSTEM Active Contract Opportunity Notice ID... ...
INTERIOR, DEPARTMENT OF THE
Bid Due: 9/03/2026
...Bid #2007000351 Main Street Water Treatment Plant (MSWTP) Sedimentation Bed Relocation... & Riverfront ...
City of Yuma
Bid Due:
...Project: Agua Viva Water Treatment Facility Reservoir No. 1 Roof Structure Replacement...: Rehabilitation ...
City of Yuma
Bid Due: 9/10/2026
...Activated Carbon (I2/g 600 wood based) for use in the City of Tempe's ...
City of Tempe
Bid Due: 9/09/2026