Mississippi River Basin, Lock 19, Keokuk, IA, Nose Pier Replacement and Bulkhead Recesses

Location: Iowa
Posted: Jun 25, 2025
Due: Aug 4, 2025
Agency: DEPT OF DEFENSE
Type of Government: Federal
Category:
  • Y - Construction of Structures and Facilities
Solicitation No: W912EK25RA018SOL
Publication URL: To access bid details, please log in.
Follow
Mississippi River Basin, Lock 19, Keokuk, IA, Nose Pier Replacement and Bulkhead Recesses
Active
Contract Opportunity
Notice ID
W912EK25RA018SOL
Related Notice
W912EK25RA018LOCK19PRESOL
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Major Command
US ARMY CORPS OF ENGINEERS
Sub Command
ENGINEER DIVISION MISSISSIPPI VALLEY
Office
W07V ENDIST ROCK ISLAND
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information View Changes
  • Contract Opportunity Type: Solicitation (Updated)
  • Updated Published Date: Jun 25, 2025 02:24 pm CDT
  • Original Published Date: Jun 18, 2025 03:22 pm CDT
  • Updated Date Offers Due: Aug 04, 2025 02:00 pm CDT
  • Original Date Offers Due: Aug 04, 2025 02:00 pm CDT
  • Inactive Policy: 15 days after date offers due
  • Updated Inactive Date: Aug 19, 2025
  • Original Inactive Date: Aug 19, 2025
  • Initiative:
    • None
Classification
  • Original Set Aside: No Set aside used
  • Product Service Code: Y1PZ - CONSTRUCTION OF OTHER NON-BUILDING FACILITIES
  • NAICS Code:
    • 237990 - Other Heavy and Civil Engineering Construction
  • Place of Performance:
    Keokuk , IA
    USA
Description View Changes

Project Title: Mississippi River Basin, Keokuk, IA, Lock 19 Nose Pier Replacement and Bulkhead Recess

See Section 01-11-00 of the Specifications for the Scope Of Work

Estimated Range: $25,000,000 - $100,000,000

Completion Days: 638 Consecutive Calendar Days, 973 Consecutive Calendar Days If Option 2 Is Awarded

NAICS Code: 237990 - Size Standard $45,000,000

Unrestricted - Lowest Price Technically Acceptable (LPTA)

Questions regarding this project shall be submitted via Projnet.



The US Army Corps of Engineers (USACE) Rock Island District has a requirement for a Nose Pier Replacement and Bulkhead Recess at Lock 19, Keokuk, IA. The work includes but is not limited to: a base bid and two options. The base bid extends the river wall monolith upstream and includes mobilization, hydrographic surveys, concrete removal above and underwater, mechanical dredging, underwater rock excavation, monolith extension using precast concrete segments and tremie concrete placement, checkposts and other appurtenances, fabrication of protection plate assembly, and electrical work. Option 1 constructs a bulkhead recess in the land wall and includes fabrication and installation of a cofferbox, concrete removal above and underwater, fabrication and installation of a bulkhead recess, concrete placement above and underwater, fabrication and installation a of protection plate assembly, and electrical work. Option 2 constructs the bulkhead sill and includes mobilization, hydrographic surveys, mechanical dredging, drilled shafts, stay-in-place formwork, and tremie concrete placement, and test dewatering of the upstream chamber from the new bulkhead sill to the guard gate, bulkheads will be government furnished equipment.



Updates:



06/24/2025: This is a reminder that the Pre-Bid Site Visit is scheduled for June 30, 2025 at 10:00 AM CT. Please see PREPROPOSAL MEETING NOTICE in the solicitation for further details.



06/25/2025: Amendment 0001 (located in attachments)- Adds additional highlighted requirements for the Preproposal Meeting Notice and adds FAR 52.242-5 Payments to Small Business Subcontractors.


Attachments/Links
Contact Information
Contracting Office Address
  • KO CONTRACTING DIVISION 1 ROCK ISLAND ARSENAL
  • ROCK ISLAND , IL 61299-5001
  • USA
Primary Point of Contact
Secondary Point of Contact
History

Related Document

Jun 18, 2025[Solicitation (Original)] Mississippi River Basin, Lock 19, Keokuk, IA, Nose Pier Replacement and Bulkhead Recesses
Jun 24, 2025[Solicitation (Updated)] Mississippi River Basin, Lock 19, Keokuk, IA, Nose Pier Replacement and Bulkhead Recesses
Jul 2, 2025[Solicitation (Updated)] Mississippi River Basin, Lock 19, Keokuk, IA, Nose Pier Replacement and Bulkhead Recesses
Jul 18, 2025[Solicitation (Updated)] Mississippi River Basin, Lock 19, Keokuk, IA, Nose Pier Replacement and Bulkhead Recesses
Jul 23, 2025[Solicitation (Updated)] Mississippi River Basin, Lock 19, Keokuk, IA, Nose Pier Replacement and Bulkhead Recesses
Jul 30, 2025[Solicitation (Updated)] Mississippi River Basin, Lock 19, Keokuk, IA, Nose Pier Replacement and Bulkhead Recesses
Jul 31, 2025[Solicitation (Updated)] Mississippi River Basin, Lock 19, Keokuk, IA, Nose Pier Replacement and Bulkhead Recesses
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.