| Location: | California |
|---|---|
| Posted: | Feb 18, 2025 |
| Due: | Mar 31, 2025 |
| Agency: | Los Angeles County |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | BRC0000569 |
| Publication URL: | To access bid details, please log in. |
| Solicitation Number: | BRC0000569 | ||
| Title: | Harbor-UCLA Medical Center Replacement Program Generator Building Retrofit Project Component | ||
| Department: | Public Works | ||
| Bid Type: | Construction | Bid Amount: |
$15,000,000.00 |
| Commodity: | ELECTRICAL SERVICES | ||
| Description: |
This RFP may be downloaded at the following link: https://dpw.lacounty.gov/contracts/aed_bid/ProjectDetail.aspx?project_id=BRC0000569 The Generator Building Retrofit Project at Harbor-UCLA Medical Center involves the replacement and modernization of the existing generator switchgear and associated electrical infrastructure to ensure reliable emergency power distribution for the new Inpatient Tower (IPT) and Central Utility Plant (CUP). The project is a multi-increment, multi-phase HCAI-regulated construction effort, requiring careful shutdown coordination, phased implementation, and compliance with incremental Temporary Interim Occupancy (TIO) approvals. Scope includes, but limited to, installation of new 12kV switchgear, conduit and ductbank infrastructure, seismic upgrades, and system commissioning, with stringent requirements for continuity of hospital operations, impact mitigation, and regulatory compliance. The 12KV Switchgear and associated SEL relays and controllers as noted on the drawings are Owner Furnished-Contractor Installed. The project also includes the installation of two new fuel tanks to meet the HCAI NPC-5 requirements.
This RFP may be downloaded at the following link:
https://dpw.lacounty.gov/contracts/aed_bid/ProjectDetail.aspx?project_id=BRC0000569 The Generator Building Retrofit Project at Harbor-UCLA Medical Center involves the replacement and modernization of the existing generator switchgear and associated electrical infrastructure to ensure reliable emergency power distribution for the new Inpatient Tower (IPT) and Central Utility Plant (CUP). The project is a multi-increment, multi-phase HCAI-regulated construction effort, requiring careful shutdown coordination, phased implementation, and compliance with incremental Temporary Interim Occupancy (TIO) approvals. Scope includes, but limited to, installation of new 12kV switchgear, conduit and ductbank infrastructure, seismic upgrades, and system commissioning, with stringent requirements for continuity of hospital operations, impact mitigation, and regulatory compliance. The 12KV Switchgear and associated SEL relays and controllers as noted on the drawings are Owner Furnished-Contractor Installed. The project also includes the installation of two new fuel tanks to meet the HCAI NPC-5 requirements. |
||
| Open Day: | 2/14/2025 | Close Date: |
3/31/2025 12:00:00 PM |
| Contact Name: | Matt Jerge | Contact Phone: | (626) 476-0378 |
| Contact Email: | mjerge@dpw.lacounty.gov | ||
| Last Changed On: | 2/18/2025 11:52:34 AM |

With GovernmentContracts, you can:
...Operations Division is seeking qualified, licensed, and experienced towing service providers to furnish... ...
Solano County
Bid Due: 6/19/2026
...position and two officers. The City seeks a consulting firm to ensure continuity ...
City of San Bruno
Bid Due: 6/19/2026
...continuity of services protecting service quality, and identifying opportunities for structural, fiscal... model ...
Ventura County
Bid Due: 6/17/2026