| Location: | Washington |
|---|---|
| Posted: | May 6, 2025 |
| Due: | May 16, 2025 |
| Agency: | HOMELAND SECURITY, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 20312361 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
***** THIS IS AN NMACC III POOL 1 PROJECT: ONLY NMACC III POOL 1 AWARDEES ARE ELIGIBLE TO PARTICIPATE ****
This Design-Bid Build projects requires a CERCLA clean-up effort and waterfront recapitalization at Base Seattle to support the homeporting of new USCG Polar Security Cutters. This effort is Phase 1A. Phase 1A includes, but is not limited to, the demolition of an existing building and pier (Building 3 and Pier 36, respectively), upgrading the fendering system and existing
utilities, replacing and reconfiguring floating docks and boathouse, as well as dredging and disposing of contaminated sediment at Slip 36.

With GovernmentContracts, you can:
...) Advertisement Draft Design-Build Agreement Addendum #1 Addendum #2...
Spokane Public Schools
Bid Due: 6/23/2026
...Bid No. 31-2526 Madison Elementary, Fieldhouse, and Franklin Park PDB (due: 3:00 PM ...
Spokane Public Schools
Bid Due: 6/23/2026
...and #3. The design build contractor will work closely and collaboratively with the ...
State Government of Washington
Bid Due: 11/23/2026
.../VA area as designated in the Scope of Work dated February 27, 2026. ...
Washington Metropolitan Area Transit Authority
Bid Due: 6/25/2026