| Location: | Vermont |
|---|---|
| Posted: | Sep 19, 2024 |
| Due: | Nov 15, 2024 |
| Agency: | State Government of Vermont |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
|
Bid Type: Job Contract Locations: Chittenden Keywords: Construction (Building), Plumbing and Heating, Water Treatment, Masonry, Roofing Contractor Bid Description: he Project consists of constructing new headworks, new headworks pump station, new pre-equalization tank, new SBR system, new operations building with ?ltration and UV disinfection equipment, new chemical storage and feed system, laboratory, of?ce, maintenance area, etc., demolition of existing structures, and other associated work as described in the bid documents. Complete digital Bidding Documents may be obtained or viewed on or after September 16, 2024, at the website of Hoyle Tanner, www.hoyletanner.com by clicking the Bid Portal Tab and selecting the above referenced project. You must set up your membership with QuestCDN and pay a download fee of $50 before downloading the Bidding Documents.
|
||||||||||||||||||||

With GovernmentContracts, you can:
...Thatcher Brook Sewer Protection and Bank Stabilization Request Date: 6/2/2026 5:23:15 PM Open ...
State Government of Vermont
Bid Due: 7/01/2026
...of constructing new water and sewer mains and a stormwater system for Stage ...
State Government of Vermont
Bid Due: 6/25/2026
..., stormwater collection and treatment, sewer, water, lighting, landscaping, signage, transportation...
State Government of Vermont
Bid Due: 7/02/2026
...design, stormwater collection and treatment, sewer, water, lighting, landscaping, signage...
Town of Essex
Bid Due: 6/24/2026