| Location: | Georgia |
|---|---|
| Posted: | Apr 20, 2026 |
| Due: | May 26, 2026 |
| Agency: | G. Ben Turnipseed Engineers |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Bid Date: Tuesday, May 26, 2026
Bid Time: 11:00 a.m.
Contact: Stephanie Jones, (706) 863-8800
Improvements to the Mud Creek Water Pollution Control Plant including drain valve replacement, septage receiving station, influent pump station bypass, dewatered sludge conveyor system and all appurtenances and mechanical equipment. To include electrical, painting, SCADA and miscellaneous metals, fabrication and installation.

With GovernmentContracts, you can:
...PNA 484-072426 Steel Fabrication Inspection and Testing Services Transportation-2, Department Of May... 21, ...
State Government of Georgia
Bid Due: 6/23/2026
...Fire Department is soliciting sealed proposals from qualified vendors for the design, fabrication... ...
City of Kingsland
Bid Due: 7/14/2026
...of the existing drainage structure and fabrication/construction/installation of a new drainage structure...
State Government of Georgia
Bid Due: 6/25/2026