| Location: | Georgia |
|---|---|
| Posted: | Apr 20, 2026 |
| Due: | May 26, 2026 |
| Agency: | G. Ben Turnipseed Engineers |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Bid Date: Tuesday, May 26, 2026
Bid Time: 11:00 a.m.
Contact: Stephanie Jones, (706) 863-8800
Improvements to the Mud Creek Water Pollution Control Plant including drain valve replacement, septage receiving station, influent pump station bypass, dewatered sludge conveyor system and all appurtenances and mechanical equipment. To include electrical, painting, SCADA and miscellaneous metals, fabrication and installation.

With GovernmentContracts, you can:
...lift station, controls, bypass generator receptacle, skid/frame mounted bypass pump, site piping... Project: ...
Chatham County
Bid Due: 6/30/2026
...lift station, controls, bypass generator receptacle, skid/frame mounted bypass pump, site piping... Project: ...
Chatham County
Bid Due: 6/23/2026
...the rehabilitation of an existing wastewater lift station, controls, bypass generator receptacle, skid/frame... ...
State Government of Georgia
Bid Due: 6/23/2026
...Station pump control logic and wetwell control elevations, including the installation of two ...
Forsyth County
Bid Due: 7/02/2026