| Location: | Georgia |
|---|---|
| Posted: | Apr 20, 2026 |
| Due: | May 26, 2026 |
| Agency: | G. Ben Turnipseed Engineers |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Bid Date: Tuesday, May 26, 2026
Bid Time: 11:00 a.m.
Contact: Stephanie Jones, (706) 863-8800
Improvements to the Mud Creek Water Pollution Control Plant including drain valve replacement, septage receiving station, influent pump station bypass, dewatered sludge conveyor system and all appurtenances and mechanical equipment. To include electrical, painting, SCADA and miscellaneous metals, fabrication and installation.

With GovernmentContracts, you can:
...switchgear, VFDs, control panel and associated conduit and wiring, remove electrical equipment pads... ...
State Government of Georgia
Bid Due: 8/19/2026
..., and Wetted Salt 28569 Misc. Electrical Equipment and Supplies (Not Otherwise Classified) ...
State Government of Georgia
Bid Due: 8/11/2026
...connection, concrete, soil erosion and sediment control, construction exit, electrical, mechanical... installation, valve ...
City of Covington
Bid Due: 7/30/2026
...transformer, remove electrical switchgear, VFDs, control panel and associated conduit and wiring..., remove ...
City of Duluth
Bid Due: 8/19/2026