| Location: | Georgia |
|---|---|
| Posted: | Apr 20, 2026 |
| Due: | May 26, 2026 |
| Agency: | G. Ben Turnipseed Engineers |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Bid Date: Tuesday, May 26, 2026
Bid Time: 11:00 a.m.
Contact: Stephanie Jones, (706) 863-8800
Improvements to the Mud Creek Water Pollution Control Plant including drain valve replacement, septage receiving station, influent pump station bypass, dewatered sludge conveyor system and all appurtenances and mechanical equipment. To include electrical, painting, SCADA and miscellaneous metals, fabrication and installation.

With GovernmentContracts, you can:
...linear feet of corroded corrugated metal pipe (CMP), replacement of 8 linear feet ...
City of Sandy Springs
Bid Due: 7/07/2026
...: Link Description Construction of New Freestanding 11,000 sf Pre-Engineered Metal Building in ...
State Government of Georgia
Bid Due: 6/30/2026
...' x 12' The Unit will need to be constructed maintenance free with ...
City of Sandersville
Bid Due: 6/30/2026
...for the following proposal packages: 7A. PRE-ENGINEERED METAL BUILDING ROOFING / TRIM 7B. ...
State Government of Georgia
Bid Due: 6/18/2026