| Location: | Georgia |
|---|---|
| Posted: | Apr 20, 2026 |
| Due: | May 26, 2026 |
| Agency: | G. Ben Turnipseed Engineers |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Bid Date: Tuesday, May 26, 2026
Bid Time: 11:00 a.m.
Contact: Stephanie Jones, (706) 863-8800
Improvements to the Mud Creek Water Pollution Control Plant including drain valve replacement, septage receiving station, influent pump station bypass, dewatered sludge conveyor system and all appurtenances and mechanical equipment. To include electrical, painting, SCADA and miscellaneous metals, fabrication and installation.

With GovernmentContracts, you can:
...the following painting and replacing flooring is for approximately 15,000 sq ft. Scope ...
State Government of Georgia
Bid Due: 6/16/2026
...brushing all steel components installing steel treads and painting existing steel stairs. NIGP ...
State Government of Georgia
Bid Due: 7/29/2026
.... PAINTING / CAULKING NIGP Codes Code Description 77056 Roofing, Aluminum: Corrugated, V-Crimp, ...
State Government of Georgia
Bid Due: 6/18/2026
...Management Services 91039 Janitorial and Custodial Services 91054 Painting, Maintenance and Repair...
State Government of Georgia
Bid Due: 6/26/2026