| Location: | Utah |
|---|---|
| Posted: | Aug 11, 2025 |
| Due: | Aug 15, 2025 |
| Agency: | State Government of Utah |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PWT-07-2025 |
| Publication URL: | To access bid details, please log in. |
Project Description: Construction of a 10- foot-wide asphalt trail with 1-foot shoulders, concrete pedestrian ramps, and storm drain and irrigation improvements. The project is located within UDOT right-of-way on the west side of SR-32, extending from 530 South in Kamas, Utah to the intersection of SR-35 in Francis, Utah, known as SR-32 TRAIL CONSTRUCTION, PHASE III. The scope includes, but is not limited to providing all materials and labor to install 17,200 linear feet of 10-foot-wide asphalt trail, constructing 1,000 square feet of concrete sidewalk, storm drain and irrigation upgrades, potholing and locating existing utilities, saw-cutting, removing and properly disposing of existing asphalt, installation of new trail, and restoring and revegetation of surfaces impacted by construction activities.

With GovernmentContracts, you can:
...Project: Provo City Storm Drain Materials Ref. #: PR2026001029 Department: CITIES - Provo ...
State Government of Utah
Bid Due: 6/16/2026
...Project: 2026 2000 S Storm Drain Project Ref. #: 25-044 Department: CITIES - ...
State Government of Utah
Bid Due: 6/11/2026
...Project: Request for Information - Roads, Trails, Storm Drain Systems, and Winter Maintenance... ...
State Government of Utah
Bid Due: 6/22/2026
...of storm drain utilities, reconstructing ADA ramps, and striping. The site of the ...
State Government of Utah
Bid Due: 6/25/2026