| Location: | Texas |
|---|---|
| Posted: | Mar 25, 2026 |
| Due: | Apr 22, 2026 |
| Agency: | Guadalupe-Blanco River Authority (GBRA) |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Construction of a water control structure to manage flows between Green Lake and GBRA’s diversion canal. The superstructure is comprised of NZ26 sheetpile and related connections and reinforcement. The structure includes an inlet overflow weir to allow overflow from the lake above elevation 2.0 ft (datum) and discharge through two 48-in reinforced concrete pipes to the adjacent GBRA diversion canal. Other work includes removal of the old structure remains, inlet and outlet side rock rip rap pads, an upgraded embankment access road extending over the top of the structure, and contractor’s site access development.

With GovernmentContracts, you can:
...and organize keys and software to track and provide access control....
City of Frisco
Bid Due: 8/20/2026
...information regarding an enterprise Facilities Access Control System (FACS) solution that provides secure... ...
North Texas Tollway Authority
Bid Due: 8/14/2026
...access code to participate the day of the conference. Toll-Free Number: 1-415-655-0001 , ...
City of San Antonio
Bid Due: 8/17/2026
...Description: BONFIRE REGISTRATION IS REQUIRED TO ACCESS DETAILS / BIDTABLE To access details ...
Dallas Area Rapid Transit
Bid Due: 8/10/2026