| Location: | Texas |
|---|---|
| Posted: | Mar 25, 2026 |
| Due: | Apr 22, 2026 |
| Agency: | Guadalupe-Blanco River Authority (GBRA) |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Construction of a water control structure to manage flows between Green Lake and GBRA’s diversion canal. The superstructure is comprised of NZ26 sheetpile and related connections and reinforcement. The structure includes an inlet overflow weir to allow overflow from the lake above elevation 2.0 ft (datum) and discharge through two 48-in reinforced concrete pipes to the adjacent GBRA diversion canal. Other work includes removal of the old structure remains, inlet and outlet side rock rip rap pads, an upgraded embankment access road extending over the top of the structure, and contractor’s site access development.

With GovernmentContracts, you can:
...Follow NTX Access Control System Installation Active Contract Opportunity Notice ID 36C25726Q0496... requires ...
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 6/11/2026
...services for SABCS. At a minimum, required services include: access control and credential...
University of Texas at San Antonio
Bid Due: 6/22/2026
...Project Description: BONFIRE REGISTRATION IS REQUIRED TO ACCESS DETAILS / BIDTABLE To access ...
Dallas Area Rapid Transit
Bid Due: 6/19/2026
...Description: BONFIRE REGISTRATION IS REQUIRED TO ACCESS DETAILS / BIDTABLE To access details... ...
Dallas Area Rapid Transit
Bid Due: 6/26/2026